FIR13-00141
| INSP-Final Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 3:58:54 PM | P | FAIL |
|
|
Items tested include the phone lines, sprinkler tamper switches and elevator recall. Items needed to be approved through plan review is that the firemans hat can flash when a lobby smoke detector is activated (per code it is not allowed). Also when the wharehouse smoke detector is activated the doors open to the retail side not recall to the second floor. The duct detectors do shut down the hvac units but per Robert are wired wrong. He is going to correct this item and retest. There is one additional tamper switch not shown on the plans and the possiblility of deleting a module at the elevator. These changes will need to be shown on as-builts. I notified the building owner that the annual inspections of the sprinkler systems was overdue. He made a phone call to get the work scheduled.
|
FIR13-00020
| INSP-Sprinkler Rough-in | 4/11/2013 | 4/11/2013 | 4/11/2013 3:49:58 PM | P | CANC |
|
|
Overbooked . Lonnie is going to reschedule.
|
FIR13-00043
| INSP-Final Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 3:37:32 PM | P | FAIL |
|
|
As-builts were not on site for review.
|
FIR13-00030
| INSP-Sprinkler Rough-in | 4/11/2013 | 4/11/2013 | 4/11/2013 3:34:52 PM | P | CANC |
|
|
Overbooked. Troy is going to reschedule
|
FIR12-00574
| INSP-Final Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 1:24:06 PM | P | FAIL |
|
|
Forward flush passed inspection but can not final until the latest plans have been provided.
|
FIR12-00330
| INSP-Final Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 1:19:15 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00156
| INSP-Final Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 1:18:20 PM | P | PASS |
|
|
permit finaled
|
FIR13-00156
| INSP-Sprinkler Rough-in | 4/10/2013 | 4/11/2013 | 4/11/2013 1:17:37 PM | A | PASS |
|
|
Sprinkler piping can be covered.
|
BLD13-00520
| FIRE-Final Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 12:44:50 PM | P | PASS |
|
|
Life safety passed
|
FIR13-00149
| INSP-Final Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 12:43:56 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00043
| INSP-Final Inspection | 4/10/2013 | 4/11/2013 | 4/11/2013 10:35:37 AM | A | FAIL |
|
|
Valve for the forward flush broke and the plan modifications were not on site for review.
|
FIR12-00330
| INSP-Final Inspection | 4/10/2013 | 4/11/2013 | 4/11/2013 10:33:30 AM | A | PASS |
|
|
permit finaled
|
FIR13-00111
| INSP-Final Inspection | 4/9/2013 | 4/11/2013 | 4/11/2013 8:51:22 AM | A | PASS |
|
|
Permit finaled. The delay between the temporal codes seemed longer than usual but per the technician, Brian, it has ben timed and meets code.
|