ESC13-00280
| Site Preparation | 4/11/2013 | 4/11/2013 | 4/11/2013 4:11:34 PM | P | PASS |
|
|
|
BLD13-00683
| BLD-Footing | 4/9/2013 | 4/11/2013 | 4/11/2013 4:10:52 PM | P | PASS |
|
|
bill Phone #: ###-####
|
ESC13-00265
| Site Preparation | 4/11/2013 | 4/11/2013 | 4/11/2013 4:10:04 PM | P | PART |
|
|
POst ESC permit sign and provide concrete washout.
|
BLD13-00642
| BLD-Footing | 4/10/2013 | 4/11/2013 | 4/11/2013 4:08:43 PM | P | PASS |
|
|
request early pm//Phil Phone #: ###-####
|
BLD12-03158
| BLD-Final | 4/11/2013 | 4/11/2013 | 4/11/2013 3:15:16 PM | P | NR |
|
|
Brett Phone #: ###-####
|
ESC12-01160
| Site Preparation | 4/11/2013 | 4/11/2013 | 4/11/2013 3:14:39 PM | P | CANC |
|
|
|
GCB12-00153
| GCB-Shearwall | 4/11/2013 | 4/11/2013 | 4/11/2013 2:41:30 PM | P | PASS |
|
|
Dan ###-####. Exterior wall bracing ok. This is for both units, 448 and 454. Contractor needs to start calling in both permits for inspections.
|
BLD12-01419
| BLD-Final | 4/10/2013 | 4/11/2013 | 4/11/2013 1:34:03 PM | P | PASS |
|
|
Alan Phone #: ###-####
|
BLD12-01419
| DOC - Permit Finaled | 4/11/2013 | 4/11/2013 | 4/11/2013 1:33:45 PM | P | PASS |
|
|
|
BLD12-00681
| BLD-Final | 4/10/2013 | 4/11/2013 | 4/11/2013 1:17:56 PM | A | FAIL |
|
|
mike Phone #: ###-####. Complete fire caulking under lavs and install smoke seals and self closinng doors at draft stops in attic.
|
BLD12-02691
| BLD-Framing/Rough-in | 4/10/2013 | 4/11/2013 | 4/11/2013 12:14:43 PM | A | NR |
|
|
call 1/2 hr before to meet//Mike Phone #: ###-####
|
BLD12-02691
| BLD-Wall Bracing | 4/10/2013 | 4/11/2013 | 4/11/2013 12:14:01 PM | A | DEFR |
|
|
call 1/2 hr before to meet//Mike Phone #: ###-####
|
BLD13-00231
| BLD-Conference | 4/10/2013 | 4/11/2013 | 4/11/2013 10:13:10 AM | A | DONE |
|
|
meet at 9//Jim Phone #: ###-####. Went over all framing issues with contractor and issued a correction notice.
|