FIR15-00770
| INSP-Sprinkler Rough-in | 4/11/2016 | 4/11/2016 | 4/11/2016 2:27:36 PM | P | FAIL |
|
|
Plan Modifications Are Required. Could not perform/finish rough-in since not all of the r/c's (pendant heads) had been installed. I found a missing head in the second floor remote area. There are extensive pipe changes which includes routing and many additional fittings including changing from the approved sidewall heads to pendant heads in the garage areas. Patio sidewall heads have been re-routed. Hangers are missing and heads are overspaced. Some heads can't provide coverage due to shadowing caused by walls (instead of installing two heads as per the plans, the fitter is trying to use one head to provide coverage). No tenting has been installed yet. The Fire Dept Connection was in the process of being installed in another location that was not shown on the approved plans.
|
FIR15-00770
| INSP-Sprinkler Rough-in/Hydro | 4/11/2016 | 4/11/2016 | 4/11/2016 2:14:46 PM | P | FAIL |
|
|
Could not perform hydro since not all of the r/c's (pendant heads) had been installed. I found a missing head in the second floor remote area. There are extensive pipe changes which includes routing and many additional fittings including changing from the approved sidewall heads to pendant heads in the garage areas.
|
FIR16-00002
| INSP-Final Inspection | 4/8/2016 | 4/11/2016 | 4/11/2016 12:02:51 PM | A | FAIL |
|
|
The two standard responce pendants have not been changed to quick responce. Ron is going to walk the project and make sure all is right.
|
FIR16-00157
| INSP-Final Inspection | 4/4/2016 | 4/11/2016 | 4/11/2016 9:21:11 AM | A | PASS |
|
|
permit finaled
|