FIR17-00080 INSP-Sprinkler Rough-in4/11/20174/11/20174/11/2017 2:44:25 PMPPART
Resubmitted plans have been approved for the area inspected yesterday but insulation has been installed that blocks the CC2 heads on two branchlines.
BLD17-00708 FIRE-Final Inspection4/5/20174/11/20174/11/2017 1:44:24 PMPCANC
Scott Phone #: ###-####
BLD16-03962 FIRE-Final Inspection4/11/20174/11/20174/11/2017 1:43:54 PMPFAIL
Provide annual inspection for the fire extinguishers, provide verification of annual inspections for the building fire sprinkler and fire alarm systems, provide exit signs as per the city approved plans and remove the locking hardware from the warehouse to office area. Or call plan review and get exiting updated to utilize the warehouse door not shown on the plans. Also provide testing of the existing exit signs and emergency lights. Provide sticker at the main exit
FIR17-00080 INSP-Sprinkler Rough-in4/11/20174/11/20174/11/2017 11:43:52 AMPPART
This inspection was actually performed on 4/10/17 but was input under the wrong permit number.

Rough to cover inspection passed for area marked on the city approved plans. I noted one missing sprig up that was being installed as I waited. East canopy has not been built or piping installed yet. Plans need to be resubmitted for approval showing the changing of the standard heads to the CC2's prior to more cover inspections being approved.
BLD17-00708 FIRE-Final Inspection4/5/20174/11/20174/11/2017 10:35:45 AMAFAIL
Provide annual inspection for fire extinguisher, contact plan review for revised floor plan
FIR16-00665 INSP-Sprinkler Rough-in/Hydro4/10/20174/11/20174/11/2017 10:33:49 AMAPASS
Underground hydro test passed
FIR16-00738 INSP-Sprinkler Rough-in4/10/20174/11/20174/11/2017 8:44:09 AMAPART
Todays inspection was for the same area as previously inspected but for tenting. All tenting in this area is ok except one small spot. I discussed with Herb that prior to a cover inspection being given I need verification of insulation in the eaves to keep the sprinkler coverage with-in the 30' requirements and to verify insulation in the dog houses.
BLD17-00506 FIRE-Final Inspection4/10/20174/11/20174/11/2017 8:41:41 AMAPASS
Lifes safety passed. Owner to remove the non-functional/non-required emergency lights prior to a building inspection.