FIR16-00040
| INSP-Sprinkler Rough-in | 4/11/2017 | 4/11/2017 | 4/11/2017 2:44:44 PM | P | PASS |
|
|
Rough to cover inspection for remaining underground complete, approved for cover.
|
FIR16-00040
| INSP-Final Inspection | 4/11/2017 | 4/11/2017 | 4/11/2017 2:43:54 PM | P | CANC |
|
|
Inspection request was for a rough to cover on remaining underground for northside supply, not a final inspection. This inspection request is cancelled and a rough in inspection will be generated.
|
FIR16-00556
| INSP-Sprinkler Rough-in | 4/11/2017 | 4/11/2017 | 4/11/2017 2:41:09 PM | P | PART |
|
|
Rough to cover inspection for levels 1 and 2 of pod 3 complete, approved for cover. Rough in inspection complete for level 3, tenting needs to be installed/inspected and passed before cover can be approved.
|
NAF17-00005
| INSP-Final | 4/10/2017 | 4/11/2017 | 4/11/2017 11:04:20 AM | P | PASS |
|
|
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIR17-00034
| INSP-Final Inspection | 4/11/2017 | 4/11/2017 | 4/11/2017 10:02:35 AM | A | PASS |
|
|
Final fire alarm inspection passed/complete
|
FIR16-00570
| INSP-Sprinkler Rough-in | 4/10/2017 | 4/11/2017 | 4/11/2017 9:41:57 AM | A | PASS |
|
|
Rough to cover inspection for area of work complete, approved for cover.
|
BLD16-03041
| FIRE-Final Inspection | 4/6/2017 | 4/11/2017 | 4/11/2017 8:30:32 AM | A | PASS |
|
|
No fire sprinklers, no monitored fire alarms, fire extinguishers are in place with current inspection tags. Exit lights in the south corridor will be changed to double sided exit lights as shown on city approved drawings (exit lights in place but only one sided at time of inspection, double side will be completed before final building inspection). Final life fire safey inspection passed/complete.
|