MIS18-00126
| BLD-Conference | 4/11/2018 | 4/11/2018 | 4/12/2018 9:52:20 AM | A | DONE |
|
|
dry wall has been torn off and all equipment has been taken out
|
BLD17-04122
| BLD-Conference | 4/10/2018 | 4/11/2018 | 4/12/2018 6:40:51 AM | A | PEND |
|
|
Sean Phone #: ###-#### needs to install higher locks on gates
|
BLD15-00100
| BLD-Framing/Rough-in | 4/11/2018 | 4/11/2018 | 4/12/2018 6:40:07 AM | P | NR |
|
|
call when on way // Lio Frey Phone #: ###-#### this was a conf to talk about fire ratings and how to construct
|
BLD18-00225
| BLD-Final | 4/11/2018 | 4/11/2018 | 4/11/2018 2:15:30 PM | P | PASS |
|
|
John-prefer late afternoon-call for access Phone #: ###-####
|
BLD18-00907
| BLD-Final | 4/10/2018 | 4/11/2018 | 4/11/2018 12:47:47 PM | A | PEND |
|
|
Logan Phone #: ###-#### ok after elec finals
|
BLD18-00437
| BLD-Final | 4/10/2018 | 4/11/2018 | 4/11/2018 12:05:53 PM | A | PASS |
|
|
Wendy Frost Phone #: ###-####
|
BLD18-00437
| DOC - Permit Finaled | 4/11/2018 | 4/11/2018 | 4/11/2018 12:05:43 PM | P | PASS |
|
|
|
BLD17-03967
| BLD-Final | 4/9/2018 | 4/11/2018 | 4/11/2018 10:41:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD17-03967
| DOC - Permit Finaled | 4/11/2018 | 4/11/2018 | 4/11/2018 10:41:18 AM | P | PASS |
|
|
|
BLD18-01092
| BLD-Final | 4/10/2018 | 4/11/2018 | 4/11/2018 8:59:23 AM | A | PASS |
|
|
Roof is done please call if you have any questions Phone #: ###-#### Inspection requested via web by JEREMIAH HETZEL
|
BLD18-01092
| DOC - Permit Finaled | 4/11/2018 | 4/11/2018 | 4/11/2018 8:59:14 AM | P | PASS |
|
|
|
BLD18-00225
| BLD-Final | 4/11/2018 | 4/11/2018 | 4/11/2018 8:50:37 AM | A | PEND |
|
|
ok for temp needs door and signage for rest room
|
BLD18-00350
| BLD-Ceiling Grid Inspection | 4/10/2018 | 4/11/2018 | 4/11/2018 8:32:32 AM | A | PASS |
|
|
Paul Phone #: ###-####
|