Inspections for the day of: Thursday, April 11, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00089 ELE-Final4/11/20194/11/20194/11/2019 2:34:32 PMPPASS
ok to final...permit pulled
ELE19-01265
ELE18-03476 Temporary Service4/10/20194/11/20194/11/2019 2:32:51 PMPCANC
main switch gear // Zach Phone #: ###-####
wrong inspection
ELE18-03476 Permanent Service4/11/20194/11/20194/11/2019 2:32:25 PMPPASS
main switch gear // Zach Phone #: ###-####
ok to switch meter to main switch gear to power temp power skid...another rough inspection is required to power future panels and transformers
meter at transformer now...ok
ELE19-00341 Electrical Rough-In4/11/20194/11/20194/11/2019 2:01:14 PMPPASS
Please call on arrival for access key or code.
This inspection is for partial occupancy. Homeowners would like to start moving in their belongings after this long remodel. Phone #: ###-#### Inspection requested via web by Kevin Perez...
interior plugs and swtches verified...ok
bed 1-outlet open ground
bed 2 - wall space
L/O needed hood and D/W
furnace disconnect toggle switch
D/W hookup
A/Cs need wired and exterior finished
ELE19-00948 Electrical Rough-In4/11/20194/11/20194/11/2019 1:00:20 PMPPASS
Ceiling cover. Von is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen...bathroom hard lid ok to cover
ELE19-01294 Final4/11/20194/11/20194/11/2019 12:28:43 PMPPASS
Phone #: ###-#### Inspection requested via web by Bryan McLaughlin...
new lighting LED UL listing verified
used existing circuits for cash rap...ok
ok to final
ELE19-00756 Final4/11/20194/11/20194/11/2019 10:53:16 AMPPASS
reinspect...corrections made...ok to final
ELE19-00392 Final4/10/20194/11/20194/11/2019 10:52:46 AMPPASS
Phone #: ###-#### Inspection requested via web by Greg Traudt...WRONG PERMIT FOR HOUSE...this is for temp pole...needs finaled to close...ok
ELE18-00675 Final4/11/20194/11/20194/11/2019 10:40:00 AMAPASS
electrical work complete...ok to final
general contractor and homeowner not complying with getting HVAC permit for new exhaust fans
ELE19-00901 Final4/9/20194/11/20194/11/2019 10:19:42 AMAPASS
customer phone # ###-####, electrician phone # ###-####; finalizing old permits, no electrician onsite, call for details. Phone #: ###-#### Inspection requested via web by Matthew White...ok to final
ELE17-01103 ELE-Aging Inspection4/11/20194/11/20194/11/2019 10:06:13 AM PASS
no corrections needed...final scheduled
ELE17-01103 Final4/11/20194/11/20194/11/2019 10:05:41 AMAPASS
ok to final
ELE19-01245 Electrical Rough-In4/10/20194/11/20194/11/2019 9:23:27 AMAPASS
Bill Phone #: ###-####...
rough in ok to cover excluding shared wall with existing dining wall...junction boxes and switches need addressed before ok to cover...will schedule another rough in inspection