PLM01-00986
| Water and/or Sewer | 4/11/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | A | FAIL |
|
|
sewer ###-#### test not on, regrade pipe first 50 to 100 feet from building and bring shelf up to invert of sewer accross entire bottom of trench. 4/12/2001 10:33:51 AM
|
PLM01-01091
| Sprinkler (Final) | 4/11/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-01096
| Groundwork | 4/11/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | A | PASS |
|
|
De Best ###-####
|
PLM01-01112
| Sprinkler (Final) | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | A | PASS |
|
|
for common area Tim ###-####
|
PLM01-01116
| Groundwork | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | P | FAIL |
|
|
###-#### not enough grade on pipes in several places. test not on yet. 4/12/2001 3:05:32 PM
|
PLM01-00986
| Water and/or Sewer | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 309 On 4/12/2001 12:46:36 PM
|
PLM01-01116
| Groundwork | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 309 On 4/12/2001 3:04:02 PM Gave ok on waste, but need approval letter from engineer on underslap copper water piping, could not find where it showed that way on plan. 4/12/2001 5:17:51 PM
|
PLM00-04161
| Final | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | P | FAIL |
|
|
after 2 pm ###-#### Tim Need rp valve on pressure washer. 4/12/2001 3:58:48 PM
|
PLM01-01058
| Water and/or Sewer | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | P | PASS |
|
|
###-#### W/S FINAL
|