BLD01-00369
| BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | A | PART |
|
|
fr insp brian ###-#### ok to cover core board. 4/12/2001 12:01:11 PM
|
BLD00-02809
| BLD-Conference | 4/11/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | A | PART |
|
|
Tim ###-####
|
BLD01-00411
| BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | A | FAIL |
|
|
CEILING #1077 ###-#### c/n posted. 4/12/2001 11:55:39 AM
|
BLD01-00586
| BLD-Final | 4/11/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | A | FAIL |
|
|
fn occ-- brian -###-#### needs fls/ele final,rest room mens,req 5 foot turn,trim both sinks to req under for clearance fire/safe top of wall. 4/12/2001 12:00:42 PM
|
BLD01-00265
| BLD-Other | 4/11/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/11/2001 at 16:57:26. Contact: ###-####.front column at repair entrance, removed suport post for stair landing replaced with angle supported at top,as per plans. 4/12/2001 10:46:15 AM
|
BLD01-00772
| BLD-Footing | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | P | PART |
|
|
###-#### appears ok np. 4/12/2001 3:39:10 PM
|
BLD01-00461
| BLD-Framing/Rough-in | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/12/2001 at 10:06:26. Contact: ###-####.c/n posted. 4/12/2001 4:24:49 PM
|
BLD01-00681
| BLD-Framing/Rough-in | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | P | NR |
|
|
###-#### needsmec inspection not ready posted c/n. 4/12/2001 3:17:00 PM
|
BLD01-00680
| BLD-Framing/Rough-in | 4/12/2001 | 4/12/2001 | 4/12/2001 12:00:00 AM | P | FAIL |
|
|
###-#### c/n posted. 4/12/2001 3:16:37 PM
|