Inspections for the day of: Thursday, April 12, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-00587 Final4/11/20014/12/20014/12/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/11/2001 at 11:59:34. Contact: ###-####.
BLD01-00395 BLD-Other4/11/20014/12/20014/12/2001 12:00:00 AMAFAIL
Shear inspection - Terry, ###-#### C/N posted on site. 4/12/2001 11:38:24 AM
BLD01-00549 BLD-Other4/11/20014/12/20014/12/2001 12:00:00 AMAFAIL
Shear inspection - Terry - ###-#### C/N posted on site. 4/12/2001 10:47:45 AM
BLD01-00444 BLD-Other4/11/20014/12/20014/12/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/11/2001 at 16:26:06. Contact: ###-####. Shear--ok to cover 4/12/2001 11:18:45 AM
MEC01-00572 Final4/11/20014/12/20014/12/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/11/2001 at 16:51:39. Contact: ###-####.
BLD01-00815 BLD-Foundation4/12/20014/12/20014/12/2001 12:00:00 AMPPART
BRENT ###-####wip 4/12/2001 11:56:16 AM
BLD01-00682 BLD-Footing4/12/20014/12/20014/12/2001 12:00:00 AMPPART
CLINT ###-#### 14236 AFTER BEEP wip-Called builder-Greg Colman ###-####-Basement floor has importent footings -need inspection prior to pouring. 4/12/2001 2:04:44 PM
BLD01-00560 BLD-Foundation4/12/20014/12/20014/12/2001 12:00:00 AMPPART
JERRY ###-#### wip 4/12/2001 1:47:12 PM
BLD01-00764 BLD-Footing4/12/20014/12/20014/12/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/12/2001 at 10:09:01. Contact: ###-####. wip 4/12/2001 2:58:15 PM
BLD01-00270 BLD-Wall cover4/12/20014/12/20014/12/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 04/12/2001 at 10:26:52. Contact: .
BLD01-00161 BLD-Framing/Rough-in4/12/20014/12/20014/12/2001 12:00:00 AMPPASS
Scheduled by Inspector: 420 On 4/12/2001 2:19:40 PM Shear--ok to side-prior c/n items corrected. 4/12/2001 2:20:14 PM