PLM02-00668
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 4/11/2002 9:05:30 AM test premise dcva, temp occ ok 4/12/2002 8:42:43 AM
|
PLM02-00834
| Plumbing Rough-in | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 330 On 4/11/2002 10:07:28 AM check interceptor and water system interceptor test ok ri complete ok 4/12/2002 9:54:08 AM
|
PLM02-00954
| Sprinkler (Final) | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-00955
| Plumbing Rough-in | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-00078
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 14:07:12. Contact: ###-####.
|
PLM02-00950
| Sprinkler (Final) | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 14:39:38. Contact: ###-####.
|
PLM01-03658
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
###-#### access code 3478
|
PLM02-00960
| Plumbing Rough-in | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PASS |
|
|
###-#### MATE
|
PLM01-01977
| Final | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | FAIL |
|
|
BUILDING IS SCHEDULED AT 3:00 PER GEORGE SLANE check t&p valve and pipe to floor, calk utility 4/12/2002 3:10:51 PM sink 4/12/2002 3:10:55 PM
|
PLM02-00509
| Plumbing Rough-in | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PASS |
|
|
###-#### check water heater t&p drain on the final 4/12/2002 10:12:11 AM
|
PLM02-00883
| Plumbing Rough-in | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 08:32:44. Contact: ###-####. g/w ri ok 4/12/2002 2:48:30 PM still needs vtr 4/12/2002 2:48:43 PM
|
PLM02-00879
| Water and/or Sewer | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 10:11:38. Contact: ###-####. services ok to cover need tests, 3 services south side 4/12/2002 2:27:38 PM
|
PLM01-04086
| Final | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PASS |
|
|
GREG ###-#### looks like they changed the address to 5234 quarterpath final ok 4/12/2002 3:47:33 PM
|
PLM02-00944
| Water and/or Sewer | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 4/12/2002 1:53:08 PM well disconnect, called in to rita at 1:30
|
PLM01-03729
| Water and/or Sewer | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 4/12/2002 4:43:34 PM started exterior rain drains
|