Inspections for the day of: Friday, April 12, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00704 BLD-Framing/Rough-in4/11/20024/12/20024/12/2002 12:00:00 AMAFAIL
###-####Posted c/n obtain electrical inspection
BLD01-02612 BLD-Framing/Rough-in4/11/20024/12/20024/12/2002 12:00:00 AMAPART
###-#### larry \\groutingnew detailstamp by engineer ok. 4/12/2002 12:15:05 PM
BLD01-02064 BLD-Final4/11/20024/12/20024/12/2002 12:00:00 AMAFAIL
Robert ###-####. The fire glass has been put in ok. The door to office manager, does not have a safety glass stamp. Note this glass was not in the door at last inspection. That is why I was verifiying this day ,called contractor left message. 4/12/2002 12:16:58 PM
BLD02-00160 BLD-Energy code compliance4/11/20024/12/20024/12/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/11/2002 at 16:09:32. Contact: ###-####.. Needs attic acess and remove vapor barrier from return in wall also insulate retur upper floor same wall c/n posted and contractor notified. 4/12/2002 12:18:15 PM
BLD02-00201 BLD-Other4/11/20024/12/20024/12/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/11/2002 at 18:43:52. Contact: ###-####. black grid ok ,the rest needs slack taken out of perimeter wires. 4/12/2002 3:12:14 PM
BLD01-02802 BLD-Framing/Rough-in4/11/20024/12/20024/12/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/11/2002 at 19:04:46. Contact: ###-####.. ok need architect to suppy info for glue lam beam ie:1hr fire resistive. or drywall. notified framing contractor.4/12/2002 3:13:10 PM 4/12/2002 3:13:53 PM
BLD02-00112 BLD-Final4/12/20024/12/20024/12/2002 12:00:00 AMPPASS
###-####ok perm oc. 4/12/2002 4:27:01 PM
BLD02-00160 BLD-Energy code compliance4/12/20024/12/20024/12/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/12/2002 at 09:44:03. Contact: ###-####.
BLD02-00349 BLD-Framing/Rough-in4/12/20024/12/20024/12/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/12/2002 at 09:52:53. Contact: ###-####.
BLD02-00006 BLD-Final4/12/20024/12/20024/12/2002 12:00:00 AMPPART
###-####ok temp oc, c/n for restroom 4/12/2002 4:27:20 PM