MEC02-00647
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 16:39:03. Contact: ###-####...latah..right on kipling 4/12/2002 8:09:13 AM called april 4/12/2002 11:54:20 AM
|
MEC02-00665
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 16:39:27. Contact: ###-####.
|
MEC01-03758
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
###-####...vista..left on nez perce 4/12/2002 8:09:37 AM
|
MEC02-00920
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
go to the door ###-####
|
MEC02-00976
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | NH |
|
|
###-#### DEANNA OR PEGGY ###-####..fairview right on allumbaugh 4/12/2002 8:07:28 AM...called # at 8:55..nobody home 4/12/2002 9:44:39 AM
|
MEC02-00952
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | A | PASS |
|
|
###-#### GERRY ..vista..left on elder..right on owyhee 4/12/2002 8:10:49 AM
|
MEC02-00660
| Final | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 15:31:46. Contact: ###-####.
|
MEC02-00605
| Rough-in | 4/11/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 21:07:56. Contact: ###-####.
|
MEC02-00942
| Final | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 08:45:39. Contact: ###-####. o access 4/12/2002 7:07:49 PM
|
MEC02-00978
| Final | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | NH |
|
|
###-#### THOm 4/12/2002 2:15:18 PM as....called # at 1:58...nobody home 4/12/2002 2:15:48 PM
|
MEC02-00953
| Pressure Test | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 10:20:19. Contact: ###-####. waiting on corey with info about gas line and btu load 4/12/2002 7:10:18 PM
|
MEC02-00953
| Rough-in | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 10:20:41. Contact: ###-####. already done 4/12/2002 7:10:25 PM
|
MEC02-00980
| Pressure Test | 4/12/2002 | 4/12/2002 | 4/12/2002 12:00:00 AM | P | NR |
|
|
###-#### BRYAN...collister..right on briarhill 4/12/2002 12:32:02 PM
|