Inspections for the day of: Friday, April 12, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00647 Final4/11/20024/12/20024/12/2002 12:00:00 AMANH
Scheduled by a contractor via Hello! on 04/11/2002 at 16:39:03. Contact: ###-####...latah..right on kipling 4/12/2002 8:09:13 AM called april 4/12/2002 11:54:20 AM
MEC02-00665 Final4/11/20024/12/20024/12/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/11/2002 at 16:39:27. Contact: ###-####.
MEC01-03758 Final4/11/20024/12/20024/12/2002 12:00:00 AMAPASS
###-####...vista..left on nez perce 4/12/2002 8:09:37 AM
MEC02-00920 Final4/11/20024/12/20024/12/2002 12:00:00 AMAPASS
go to the door ###-####
MEC02-00976 Final4/11/20024/12/20024/12/2002 12:00:00 AMANH
###-#### DEANNA OR PEGGY ###-####..fairview right on allumbaugh 4/12/2002 8:07:28 AM...called # at 8:55..nobody home 4/12/2002 9:44:39 AM
MEC02-00952 Final4/11/20024/12/20024/12/2002 12:00:00 AMAPASS
###-#### GERRY ..vista..left on elder..right on owyhee 4/12/2002 8:10:49 AM
MEC02-00660 Final4/11/20024/12/20024/12/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/11/2002 at 15:31:46. Contact: ###-####.
MEC02-00605 Rough-in4/11/20024/12/20024/12/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/11/2002 at 21:07:56. Contact: ###-####.
MEC02-00942 Final4/12/20024/12/20024/12/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/12/2002 at 08:45:39. Contact: ###-####. o access 4/12/2002 7:07:49 PM
MEC02-00978 Final4/12/20024/12/20024/12/2002 12:00:00 AMPNH
###-#### THOm 4/12/2002 2:15:18 PM as....called # at 1:58...nobody home 4/12/2002 2:15:48 PM
MEC02-00953 Pressure Test4/12/20024/12/20024/12/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 04/12/2002 at 10:20:19. Contact: ###-####. waiting on corey with info about gas line and btu load 4/12/2002 7:10:18 PM
MEC02-00953 Rough-in4/12/20024/12/20024/12/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/12/2002 at 10:20:41. Contact: ###-####. already done 4/12/2002 7:10:25 PM
MEC02-00980 Pressure Test4/12/20024/12/20024/12/2002 12:00:00 AMPNR
###-#### BRYAN...collister..right on briarhill 4/12/2002 12:32:02 PM