Inspections for the day of: Friday, April 12, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00622 BLD-Footing4/10/20024/12/20024/12/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/10/2002 at 18:34:54. Contact: ###-####.
BLD02-00624 BLD-Footing4/10/20024/12/20024/12/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/10/2002 at 18:36:04. Contact: ###-####.
BLD02-00628 BLD-Footing4/10/20024/12/20024/12/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/10/2002 at 18:37:09. Contact: ###-####.
MEC01-03817 Final4/11/20024/12/20024/12/2002 12:00:00 AMAPASS
###-####...ustick..north on maple grove 4/12/2002 8:13:54 AM
BLD01-02751 BLD-Final4/11/20024/12/20024/12/2002 12:00:00 AMAFAIL
###-#### every thing ok but for paper on insulation in crawel space 4/12/2002 9:16:51 AM
BLD02-00612 BLD-Framing/Rough-in4/11/20024/12/20024/12/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/11/2002 at 15:22:36. Contact: ###-####.c/n on site 4/12/2002 10:32:22 AM
BLD02-00717 BLD-Framing/Rough-in4/11/20024/12/20024/12/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/11/2002 at 16:48:34. Contact: . shear ok framing ok insulation ok 4/12/2002 8:56:59 AM
BLD01-01477 BLD-Conference4/12/20024/12/20024/12/2002 12:00:00 AMPDONE
###-#### ERIN talked about what he needed to do befor he called for a framing inspection 4/12/2002 1:54:24 PM
BLD02-00300 BLD-Foundation4/12/20024/12/20024/12/2002 12:00:00 AMPPART
###-#### int column pads also ext column foundations four of the ftgs are off by about 2ft arc neededs to appr fix ok to pour after he oks 4/12/2002 1:56:45 PM
MEC02-00907 Rough-in4/12/20024/12/20024/12/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/12/2002 at 10:30:59. Contact: ###-####.
MEC02-00907 Pressure Test4/12/20024/12/20024/12/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/12/2002 at 10:31:22. Contact: ###-####.
BLD02-00474 BLD-Framing/Rough-in4/11/20024/12/20024/12/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 04/11/2002 at 15:27:24. Contact: ###-####.
BLD01-00863 BLD-Energy code compliance4/11/20024/12/20024/12/2002 12:00:00 AMPPASS
###-#### ok to cover 4/12/2002 10:14:40 AM
BLD01-02751 BLD-Final4/11/20024/12/20024/12/2002 12:00:00 AMPPASS
###-#### c.c # 23082 issued 4/12/2002 12:34:36 PM
BLD01-02154 BLD-Framing/Rough-in4/11/20024/12/20024/12/2002 12:00:00 AMPPASS
roof nailing\\###-####