Inspections for the day of: Monday, April 12, 2004.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00054 INSP-Final Inspection4/8/20044/12/20044/12/2004 12:00:00 AMAPASS
fire alarm finaled 4/12/2004 10:46:34 AM
FIR04-00022 INSP-Final Inspection4/9/20044/12/20044/12/2004 12:00:00 AMAPASS
fire alarm finaled 4/12/2004 10:50:22 AM
BLD03-00675 FIRE-Final Inspection4/9/20044/12/20044/12/2004 12:00:00 AMAFAIL
MARIANNA OR ###-####; Phone #: ###-#### Provide fire alarm permit and city approved fire alarm drawings as required by the plan review notes. Mount and tag fire extinguishers. Provide building address. 4/12/2004 10:52:38 AM
BLD03-01695 FIRE-Final Inspection4/12/20044/12/20044/12/2004 12:00:00 AMAFAIL
Provide approved door hardware on the second floor double doors at conference room
FIR03-00657 INSP-Final Inspection4/12/20044/12/20044/12/2004 12:00:00 AMAPASS
Underground supply finaled. Hydro test and flush recorded under FIR03-00780
FIR03-00780 INSP-Final Inspection4/12/20044/12/20044/12/2004 12:00:00 AMPFAIL
forward flush failed through the 2" drain. Provide heat for the riser room 4/12/2004 2:32:20 PM
FIR03-00669 INSP-Sprinkler Rough-in/Hydro4/9/20044/12/20044/12/2004 12:00:00 AMPPART
Inspection was for the wet system below the hardlid. See city approved plans for location where hangers need to be added, earthquake bracing added and sprinklers added. 4/12/2004 3:44:44 PM