BLD04-00031
| BLD-Wall cover | 4/9/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | A | PART |
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Provide 48" clearance at hallway between restrooms. Ok to cover walls other areas. 4/12/2004 10:08:15 AM
|
BLD03-01267
| BLD-Other | 4/9/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/9/2004 at 1:28:38 PM. Contact: ###-####.ok to drop tiles in t-bar. 4/12/2004 10:56:45 AM
|
BLD04-00510
| BLD-Framing/Rough-in | 4/9/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/9/2004 at 1:31:04 PM. Contact: ###-####. ok to cover walls pending electrical approval. 4/12/2004 10:57:15 AM
|
BLD03-02337
| BLD-Final | 4/9/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | P | FAIL |
|
|
garage code is 1234; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
c/n posted in kitchen 4/12/2004 2:44:30 PM
|
BLD04-00473
| BLD-Footing | 4/11/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 4/11/2004 at 7:46:42 PM. Contact: ###-####. wip, no rebar installed. 4/12/2004 3:45:36 PM
|
BLD03-02207
| BLD-Final | 4/12/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | P | FAIL |
|
|
garage code is 1234; Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
C/N posted in kitchen 4/12/2004 1:46:41 PM
|
MEC04-00942
| Rough-in | 4/12/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | P | PASS |
|
|
AN ###-#### -call 1st before insp
|
MEC04-00916
| Rough-in | 4/12/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | P | FAIL |
|
|
Need to complete fireplaces and verify contractor install sleeve for b- vent. 4/12/2004 2:45:56 PM 4/12/2004 2:48:38 PM
|
MEC04-00916
| Pressure Test | 4/12/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | P | PASS |
|
|
|
MEC04-00078
| Final | 4/12/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | P | PASS |
|
|
fireplace/gas
|
MEC04-00942
| Pressure Test | 4/12/2004 | 4/12/2004 | 4/12/2004 12:00:00 AM | P | PASS |
|
|
|