BLD04-01836
| BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 3:18:46 PM | A | DONE |
|
|
wip, pending alarm and sprinkler permit finals.
|
BLD04-01885
| BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 3:18:12 PM | A | DONE |
|
|
wip, pending alarm and sprinkler permit finals.
|
BLD04-01308
| BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 3:17:37 PM | A | DONE |
|
|
wip, pending alarm and sprinkler permit finals.
|
BLD04-00079
| BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 3:17:02 PM | A | DONE |
|
|
wip, final pending alarm and sprinkler permit finals.
|
FIR05-00272
| INSP-Sprinkler Rough-in | 4/11/2006 | 4/12/2006 | 4/13/2006 8:21:49 AM | A | PART |
|
|
Reducing bushing near the first floor riser and above the 3rd floor southeast master bathroom are not engaged properly in the fitting socket , elevator shaft heads are not installed at this time, the 2nd floor riser main is exposed in a closet-need to conceal or provide protection, possible light fixture obstruction at the 2nd floor west elevator lobby, no cover is allowed on the 3rd floor until a tenting inspection has been completed for cold cavity protection.
|
FIR05-00709
| INSP-Sprinkler Rough-in/Hydro | 4/12/2006 | 4/12/2006 | 4/13/2006 7:58:41 AM | P | DEFR |
|
|
Scheduled by a contractor via Hello! on 4/12/2006 at 8:51:23 AM. Contact: ###-####. Inspection to be completed 4/13.
|
FIR05-00449
| INSP-Alarm Testing | 4/10/2006 | 4/12/2006 | 4/13/2006 7:53:45 AM | A | PART |
|
|
Tested detection and notification devices on floors 7 through 11, air handlers in the fan rooms were not in condition to be tested, firemans phone jacks and elevator lobbies not tested at this inspection, voice evac re-tested for functionality at the 6th floor, need to date batteries at the 6th and 8th floor nac panels.
|
FIR06-00142
| INSP-Final Inspection | 4/12/2006 | 4/12/2006 | 4/13/2006 7:48:09 AM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR06-00142
| INSP-Sprinkler Rough-in/Hydro | 4/12/2006 | 4/12/2006 | 4/12/2006 2:16:51 PM | P | PART |
|
|
Fire sprinkler work is satisfactory, contractor to install head cages at the uprights below the ductwork as heads at this location are subject to mechanical damage due to height AFF.
|
BLD04-00949
| FIRE-Final Inspection | 4/11/2006 | 4/12/2006 | 4/12/2006 12:19:53 PM | A | PASS |
|
|
Life safety inspection passed, one missing fire extinguisher in unit 2446 installed while on site.
|
FIR05-00667
| INSP-Sprinkler Rough-in | 4/11/2006 | 4/12/2006 | 4/12/2006 10:15:34 AM | A | PART |
|
|
The remainder of sprinkler relocation work under this permit scope is good for cover as marked on approved plans, final pending ceiling tile and escutcheons.
|
FIR06-00156
| INSP-Final Inspection | 4/11/2006 | 4/12/2006 | 4/12/2006 10:11:50 AM | A | PASS |
|
|
Required corrections have been made, fire sprinkler permit finaled.
|
FIR05-00406
| INSP-Alarm Testing | 4/10/2006 | 4/12/2006 | 4/12/2006 10:10:04 AM | A | FAIL |
|
|
The notification devices within the remodeled TI space failed to operate upon alarm activation under battery power.
|
FIR06-00081
| INSP-Alarm Testing | 4/10/2006 | 4/12/2006 | 4/12/2006 10:07:21 AM | A | PASS |
|
|
Fire alarm work passed field inspection.
|
FIR06-00061
| INSP-Final Inspection | 4/7/2006 | 4/12/2006 | 4/12/2006 10:05:54 AM | A | PASS |
|
|
Fire sprinkler modifications are satisfactory, inspection passed.
|