Inspections for the day of: Wednesday, April 12, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-01836 BLD-Final4/11/20064/12/20064/17/2006 3:18:46 PMADONE
wip, pending alarm and sprinkler permit finals.
BLD04-01885 BLD-Final4/11/20064/12/20064/17/2006 3:18:12 PMADONE
wip, pending alarm and sprinkler permit finals.
BLD04-01308 BLD-Final4/11/20064/12/20064/17/2006 3:17:37 PMADONE
wip, pending alarm and sprinkler permit finals.
BLD04-00079 BLD-Final4/11/20064/12/20064/17/2006 3:17:02 PMADONE
wip, final pending alarm and sprinkler permit finals.
FIR05-00272 INSP-Sprinkler Rough-in4/11/20064/12/20064/13/2006 8:21:49 AMAPART
Reducing bushing near the first floor riser and above the 3rd floor southeast master bathroom are not engaged properly in the fitting socket , elevator shaft heads are not installed at this time, the 2nd floor riser main is exposed in a closet-need to conceal or provide protection, possible light fixture obstruction at the 2nd floor west elevator lobby, no cover is allowed on the 3rd floor until a tenting inspection has been completed for cold cavity protection.
FIR05-00709 INSP-Sprinkler Rough-in/Hydro4/12/20064/12/20064/13/2006 7:58:41 AMPDEFR
Scheduled by a contractor via Hello! on 4/12/2006 at 8:51:23 AM. Contact: ###-####. Inspection to be completed 4/13.
FIR05-00449 INSP-Alarm Testing4/10/20064/12/20064/13/2006 7:53:45 AMAPART
Tested detection and notification devices on floors 7 through 11, air handlers in the fan rooms were not in condition to be tested, firemans phone jacks and elevator lobbies not tested at this inspection, voice evac re-tested for functionality at the 6th floor, need to date batteries at the 6th and 8th floor nac panels.
FIR06-00142 INSP-Final Inspection4/12/20064/12/20064/13/2006 7:48:09 AMPPASS
Fire sprinkler permit finaled.
FIR06-00142 INSP-Sprinkler Rough-in/Hydro4/12/20064/12/20064/12/2006 2:16:51 PMPPART
Fire sprinkler work is satisfactory, contractor to install head cages at the uprights below the ductwork as heads at this location are subject to mechanical damage due to height AFF.
BLD04-00949 FIRE-Final Inspection4/11/20064/12/20064/12/2006 12:19:53 PMAPASS
Life safety inspection passed, one missing fire extinguisher in unit 2446 installed while on site.
FIR05-00667 INSP-Sprinkler Rough-in4/11/20064/12/20064/12/2006 10:15:34 AMAPART
The remainder of sprinkler relocation work under this permit scope is good for cover as marked on approved plans, final pending ceiling tile and escutcheons.
FIR06-00156 INSP-Final Inspection4/11/20064/12/20064/12/2006 10:11:50 AMAPASS
Required corrections have been made, fire sprinkler permit finaled.
FIR05-00406 INSP-Alarm Testing4/10/20064/12/20064/12/2006 10:10:04 AMAFAIL
The notification devices within the remodeled TI space failed to operate upon alarm activation under battery power.
FIR06-00081 INSP-Alarm Testing4/10/20064/12/20064/12/2006 10:07:21 AMAPASS
Fire alarm work passed field inspection.
FIR06-00061 INSP-Final Inspection4/7/20064/12/20064/12/2006 10:05:54 AMAPASS
Fire sprinkler modifications are satisfactory, inspection passed.