BLD05-00983
| BLD-Energy code compliance | 4/12/2006 | 4/12/2006 | 4/12/2006 3:34:47 PM | P | NR |
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. 3rd floor was complete, noted to contractor ok to start sheetrock on 3rd floor only. Also reveiwed engineering for posts in garage and beams on main level. Beams in main level ok, additional post werre added in garage as per engineering.
|
BLD05-02015
| BLD-Framing/Rough-in | 4/11/2006 | 4/12/2006 | 4/12/2006 2:09:26 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 4/11/2006 at 1:05:31 PM. Contact: ###-####. Performed walk thru with general contractor and discussed general items regarding the floor ceiling assemblies, egress stairway. wip. Noted that steel beams are being wrapped with double layer 1/2'' rock and being capped with 5/8 type X as per details. Also reveiwed UL listing requirements for rated penetrations.
|
BLD05-02379
| BLD-Foundation | 4/11/2006 | 4/12/2006 | 4/12/2006 11:17:43 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/11/2006 at 1:34:43 PM. Contact: ###-####. Perimeter stemwalls east, south and southwest stemwalls.
|
BLD05-02379
| BLD-Footing | 4/11/2006 | 4/12/2006 | 4/12/2006 11:15:52 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/11/2006 at 1:34:01 PM. Contact: ###-####. Interoir column pad footings, south half.
|
BLD05-01861
| BLD-Framing/Rough-in | 4/11/2006 | 4/12/2006 | 4/12/2006 10:14:34 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/11/2006 at 9:59:16 AM. Contact: ###-####. Inspected shear nailing on south wall, roof sheating and all related hardware, holdowns and roof trusses. Noted all strapping on bldg. walls is complete. wip on straps from lvl's to bldg. Also noted wip on the two hour firewall extension from cmu wall out to canopy down to the soffit. Noted letter from engineer approving the use of fire rated plywood on exterior of bldg. in leiu of the two layers of 5/8 type X at either side of masonry wall.
|
MIS06-00007
| MIS-Aging Inspection | 4/12/2006 | 4/12/2006 | 4/12/2006 9:12:03 AM | | DONE |
|
|
Mobile home is in place. block and tie not complete. noted no occupants.
|
BLD05-02738
| BLD-Aging Inspection | 4/12/2006 | 4/12/2006 | 4/12/2006 8:51:22 AM | | DONE |
|
|
It appears that work is in progress. no one on site to talk to.
|