ESC11-00184
| Conference | 4/12/2011 | 4/12/2011 | 4/12/2011 2:34:04 PM | P | DONE |
|
|
1:30: Met with Knife River, Jeff & Curtis, Construction Manager, (J. Conger), Third party inspector (Phil from Ground FX) and inspector 460. Handed out and reviewed ESC Permit conditions, turbid discharge cannot be released off site, tracking controls needed (two locations), street in need of sweeping and posting of signage (local and federal) needed. Inspector 460 will follow up.
|