FIR11-00149
| INSP-Sprinkler Rough-in/Hydro | 4/12/2011 | 4/12/2011 | 4/12/2011 3:26:25 PM | P | PASS |
|
|
An 8" lintel needs to be installed in the master shower area as discussed or a sprinkler pendant added. Also sprinkler pendants are located too close to one another in the living room area and will need to be relocated. These items can be verified at the final inspection. Sprinkler piping can be covered.
|
FIR11-00152
| INSP-Conference | 4/12/2011 | 4/12/2011 | 4/12/2011 3:23:24 PM | P | PASS |
|
|
Inspection was to verify the automatic operation of the temporary controller.
|
BLD10-02915
| FIRE-Final Inspection | 4/11/2011 | 4/12/2011 | 4/12/2011 12:37:01 PM | A | FAIL |
|
|
Provide for final inspection for BLD11-00265. Provide for testing of the exit discharge lights and exit signs. Repair emergency light in "check out" area. Provide single action hardware for the west exterior exit doors (per the plans one door panel is to be fixed). The "Cylinder Closet" exterior wall venting does not meet the height requirements of IFC 3006.2.1. Provide the NFPA Hazard Warning Sign per IFC 2703.5. Door is missing the smoke seal.
|
BLD11-00375
| FIRE-Conference | 4/11/2011 | 4/12/2011 | 4/12/2011 11:46:18 AM | A | DONE |
|
|
Darren and I discussed storage arrangements.
|
BLD11-00700
| FIRE-Final Inspection | 4/11/2011 | 4/12/2011 | 4/12/2011 10:22:17 AM | A | FAIL |
|
|
Provide fire extinguishers as discussed, provide single action hardware on the warehouse doors per plans, cover the exposed electrical box. Remove the ware house racking that exceeds 8' or contact plan review for permitting.
|
BLD11-00159
| FIRE-Final Inspection | 4/11/2011 | 4/12/2011 | 4/12/2011 8:15:34 AM | A | PASS |
|
|
life safety passed
|