Inspections for the day of: Friday, April 12, 2013.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00684 INSP-Final Inspection4/11/20134/12/20134/12/2013 3:53:19 PMPPASS
Permit finaled. One horn/strobe was relocated as I waited and retested ok.
FIR12-00420 INSP-Final Inspection4/11/20134/12/20134/12/2013 3:51:41 PMPPASS
permit finaled
BLD12-02628 FIRE-Final Inspection4/11/20134/12/20134/12/2013 3:22:48 PMAPASS
life safety passed
FIR12-00574 INSP-Final Inspection4/11/20134/12/20134/12/2013 3:21:19 PMAPASS
Permit finaled
FIR13-00037 INSP-Sprinkler Rough-in4/11/20134/12/20134/12/2013 1:41:26 PMADONE
Inspection was actually for a conference to discuss the duct work causing obstructions to the sprinkler system. I refered to section 8.6.5.2.1.3 of NFPA 13.
FIR13-00030 INSP-Sprinkler Rough-in4/11/20134/12/20134/12/2013 12:48:47 PMAPASS
Sprinkler piping above hardlids is ok to cover
FIR13-00043 INSP-Final Inspection4/11/20134/12/20134/12/2013 10:34:16 AMAPASS
Permit finaled
FIR13-00020 INSP-Sprinkler Rough-in4/12/20134/12/20134/12/2013 10:10:09 AMAPASS
Tenting inspection for cover passed for east most residence.
BLD13-00676 FIRE-Final Inspection4/12/20134/12/20134/12/2013 10:07:19 AMPPASS
life safety passed
BLD13-00765 FIRE-Final Inspection4/11/20134/12/20134/12/2013 9:43:30 AMAPASS
life safety passed
FIR13-00016 INSP-Final Inspection4/12/20134/12/20134/12/2013 8:01:39 AMAPASS
Permit finaled