FIR16-00108
| INSP-Sprinkler Rough-in | 4/12/2016 | 4/12/2016 | 4/14/2016 12:36:44 PM | P | CANC |
|
|
Please call when you are heading out. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR16-00183
| INSP-Sprinkler Rough-in/Hydro | 4/12/2016 | 4/12/2016 | 4/12/2016 2:45:08 PM | P | PASS |
|
|
Under ground supply piping is ok to cover from the building to the new PIV. United water installed 4" supply piping instead of the 6" shown. I also spoke to the electrian about providing conduit for the PIV tamper switch.
|
BLD15-04346
| FIRE-Conference | 4/12/2016 | 4/12/2016 | 4/12/2016 2:36:49 PM | A | DONE |
|
|
I spoke to the project superintendant about the NFPA 20 requirements for pitched floors, floor drains, emergency lighting and ventilation.
|
BLD15-02842
| FIRE-Conference | 4/12/2016 | 4/12/2016 | 4/12/2016 12:49:38 PM | A | DONE |
|
|
Please call Barry 1 hr before arrival Phone #: ###-#### Inspection requested via web by Dennis Harmon
|
BLD16-01085
| FIRE-Final Inspection | 4/11/2016 | 4/12/2016 | 4/12/2016 10:00:05 AM | A | PASS |
|
|
Life safety passed
|