Inspections for the day of: Friday, April 12, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-00215 Final4/12/20194/12/20194/12/2019 2:11:57 PMPPASS
Call for access information, thank you Phone #: ###-#### Inspection requested via web by kim grundhauser...
ok to final
ELE19-01220 Final4/12/20194/12/20194/12/2019 1:09:42 PMPFAIL
Duke is the electrician for this project.
Office is ###-#### if you can not get a hold of him Phone #: ###-#### Inspection requested via web by Matthew White...
1) correct permit fees are needed...paid for service change only...3 new circuits ran for insta hot..another permit needs pulled or fees increased
2) load calc shall be done on panel...draw on panel is making other circuits have issues
ELE19-01210 Final4/12/20194/12/20194/12/2019 12:05:33 PMPFAIL
House is vacant and is for sale-lockbox code is 5260 on front door Phone #: ###-#### Inspection requested via web by Same Electric...
no access no code lock box could be located
also will need access to attic space..ladder required at time of inspection
ELE18-03224 Electrical Rough-In4/11/20194/12/20194/12/2019 11:30:42 AMAPASS
Contact: Wes Powell. ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden....
ok to cover vestibule and bathrooms
ELE19-01233 Permanent Service4/11/20194/12/20194/12/2019 10:50:46 AMPCANC
Cell Tower. Power may only be down for 4 hours. Inspection requested for 1:00 if at all possible. Thank You. Phone #: ###-#### Inspection requested via web by Bryan Howard...
contractor needing to pull off job...needs reengineered with Idaho Power...will continue at later date
ELE19-00661 Final4/11/20194/12/20194/12/2019 10:42:42 AMAPASS
Phone #: ###-#### Inspection requested via web by Greg Traudt....
corrections made..ok to final
ELE19-00439 Final4/11/20194/12/20194/12/2019 10:15:33 AMAPASS
Let me know if you need anything thank you Phone #: ###-#### Inspection requested via web by David Kubik...
corrections made...ok to final
ELE19-01137 Final4/11/20194/12/20194/12/2019 9:35:58 AMANR
Need a re-energize insp and final. Call Preston Saey with any questions:###-#### Phone #: ###-#### Inspection requested via web by Rob Maes...
not ready at this time....grounding for service needs verification or ground rods driven and service needs correct labelling
ELE19-01137 Permanent Service4/12/20194/12/20194/12/2019 9:34:39 AMAPASS
Need a re-energize insp and final. Call Preston Saey with any questions:###-#### Phone #: ###-#### Inspection requested via web by Rob Maes...
p/s u/g reconnection ok
ELE19-01265 Electrical Rough-In4/12/20194/12/20194/12/2019 9:06:18 AMAPASS
Need Ceiling cover...already did walls Phone #: ###-#### Inspection requested via web by Joe Easley...grid ok to close...new circuit and junctions ok
ELE19-01260 Final4/11/20194/12/20194/12/2019 8:32:23 AMAPASS
Key under mat at front garage man door. Phone #: ###-#### Inspection requested via web by Barbara Szurgot...ok
ELE17-01230 ELE-Aging Inspection4/12/20194/12/20194/12/2019 7:24:57 AM PASS
work complete
MIS19-00089 ELE-Conference4/8/20194/12/20194/11/2019 2:37:45 PMAPASS
permit pulled...see mis final notes
ELE19-00756 Final4/11/20194/12/20194/11/2019 2:03:18 PMAPASS
Phone #: ###-#### Inspection requested via web by Greg Traudt...finaled 4/11/19