ELE19-00215
| Final | 4/12/2019 | 4/12/2019 | 4/12/2019 2:11:57 PM | P | PASS |
|
|
Call for access information, thank you Phone #: ###-#### Inspection requested via web by kim grundhauser... ok to final
|
ELE19-01220
| Final | 4/12/2019 | 4/12/2019 | 4/12/2019 1:09:42 PM | P | FAIL |
|
|
Duke is the electrician for this project. Office is ###-#### if you can not get a hold of him Phone #: ###-#### Inspection requested via web by Matthew White... 1) correct permit fees are needed...paid for service change only...3 new circuits ran for insta hot..another permit needs pulled or fees increased 2) load calc shall be done on panel...draw on panel is making other circuits have issues
|
ELE19-01210
| Final | 4/12/2019 | 4/12/2019 | 4/12/2019 12:05:33 PM | P | FAIL |
|
|
House is vacant and is for sale-lockbox code is 5260 on front door Phone #: ###-#### Inspection requested via web by Same Electric... no access no code lock box could be located also will need access to attic space..ladder required at time of inspection
|
ELE18-03224
| Electrical Rough-In | 4/11/2019 | 4/12/2019 | 4/12/2019 11:30:42 AM | A | PASS |
|
|
Contact: Wes Powell. ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden.... ok to cover vestibule and bathrooms
|
ELE19-01233
| Permanent Service | 4/11/2019 | 4/12/2019 | 4/12/2019 10:50:46 AM | P | CANC |
|
|
Cell Tower. Power may only be down for 4 hours. Inspection requested for 1:00 if at all possible. Thank You. Phone #: ###-#### Inspection requested via web by Bryan Howard... contractor needing to pull off job...needs reengineered with Idaho Power...will continue at later date
|
ELE19-00661
| Final | 4/11/2019 | 4/12/2019 | 4/12/2019 10:42:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt.... corrections made..ok to final
|
ELE19-00439
| Final | 4/11/2019 | 4/12/2019 | 4/12/2019 10:15:33 AM | A | PASS |
|
|
Let me know if you need anything thank you Phone #: ###-#### Inspection requested via web by David Kubik... corrections made...ok to final
|
ELE19-01137
| Final | 4/11/2019 | 4/12/2019 | 4/12/2019 9:35:58 AM | A | NR |
|
|
Need a re-energize insp and final. Call Preston Saey with any questions:###-#### Phone #: ###-#### Inspection requested via web by Rob Maes... not ready at this time....grounding for service needs verification or ground rods driven and service needs correct labelling
|
ELE19-01137
| Permanent Service | 4/12/2019 | 4/12/2019 | 4/12/2019 9:34:39 AM | A | PASS |
|
|
Need a re-energize insp and final. Call Preston Saey with any questions:###-#### Phone #: ###-#### Inspection requested via web by Rob Maes... p/s u/g reconnection ok
|
ELE19-01265
| Electrical Rough-In | 4/12/2019 | 4/12/2019 | 4/12/2019 9:06:18 AM | A | PASS |
|
|
Need Ceiling cover...already did walls Phone #: ###-#### Inspection requested via web by Joe Easley...grid ok to close...new circuit and junctions ok
|
ELE19-01260
| Final | 4/11/2019 | 4/12/2019 | 4/12/2019 8:32:23 AM | A | PASS |
|
|
Key under mat at front garage man door. Phone #: ###-#### Inspection requested via web by Barbara Szurgot...ok
|
ELE17-01230
| ELE-Aging Inspection | 4/12/2019 | 4/12/2019 | 4/12/2019 7:24:57 AM | | PASS |
|
|
work complete
|
MIS19-00089
| ELE-Conference | 4/8/2019 | 4/12/2019 | 4/11/2019 2:37:45 PM | A | PASS |
|
|
permit pulled...see mis final notes
|
ELE19-00756
| Final | 4/11/2019 | 4/12/2019 | 4/11/2019 2:03:18 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt...finaled 4/11/19
|