BLD98-03343
| FIRE-Conference | 4/12/2000 | 4/13/2000 | 4/13/2000 12:00:00 AM | A | NR |
|
|
Mike ###-#### Contractor called- not ready- door hardware 4/14/00 11:00:46 AM
|
BLD99-03555
| FIRE-Supply Line Hydro | 4/12/2000 | 4/13/2000 | 4/13/2000 12:00:00 AM | A | FAIL |
|
|
building not sprinklered - contractor to request plumbing inspection
|
BLD99-02746
| FIRE-Final Inspection | 4/12/2000 | 4/13/2000 | 4/13/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD99-03219
| FIRE-Final Inspection | 4/13/2000 | 4/13/2000 | 4/13/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
FIR99-00668
| INSP-Sprinkler Rough-in | 4/13/2000 | 4/13/2000 | 4/13/2000 12:00:00 AM | P | FAIL |
|
|
reinspection on the r/i Anne ###-#### Hangers; retaining straps; spacing on first floor 4/14/00 11:01:18 AM
|