BLD01-00570
| BLD-Framing/Rough-in | 4/12/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | A | PART |
|
|
###-#### shear ok to side 4/13/2001 10:17:04 AM
|
BLD01-00421
| BLD-Framing/Rough-in | 4/12/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | A | NR |
|
|
###-####
|
BLD00-03077
| BLD-Foundation | 4/12/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | A | PASS |
|
|
foundation wall larry ###-####
|
BLD01-00405
| BLD-Footing | 4/12/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | A | PART |
|
|
Dan ###-#### wip 4/13/2001 11:08:18 AM
|
BLD00-02901
| BLD-Final | 4/12/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | A | PASS |
|
|
###-#### if house is locked there is a key in the electrical box in the back of the house
|
BLD00-03109
| BLD-Framing/Rough-in | 4/12/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | A | PASS |
|
|
Bob Bivin ###-####
|
BLD00-03109
| BLD-Energy code compliance | 4/13/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 408 On 4/13/2001 10:36:17 AM
|
BLD01-00306
| BLD-Framing/Rough-in | 4/13/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | P | PASS |
|
|
george ###-#### fr insp
|
BLD01-00306
| BLD-Energy code compliance | 4/13/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 408 On 4/13/2001 1:41:07 PM
|
BLD00-01776
| BLD-Final | 4/12/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | P | NR |
|
|
fn tim-- ###-####
|
MIS01-00060
| BLD-Conference | 4/13/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | P | FAIL |
|
|
Complaint that work still continuing w/out permits. If so issue SWO. issued stop work double fee if belligerent to plan reveiw or permit desk 4/13/2001 3:08:39 PM 4/13/2001 3:09:14 PM
|
BLD00-03505
| BLD-Final | 4/13/2001 | 4/13/2001 | 4/13/2001 12:00:00 AM | P | FAIL |
|
|
Jeff ###-#### no fire final 4/13/2001 5:09:42 PM
|