BLD02-02618
| FIRE-Conference | 4/3/2006 | 4/10/2006 | | P | |
|
|
Follow-up on correction notice. One week was given to start work ending on 4/10/06.
|
BLD02-02216
| FIRE-Conference | 4/3/2006 | 4/10/2006 | | P | |
|
|
Follow-up on correction notice. One week was given to start work ending on 4/10/06.
|
FIR05-00588
| FIR-Aging Inspection | 4/13/2006 | 4/13/2006 | 4/18/2006 2:33:50 PM | | NR |
|
|
Per Bill with Peak Alarm the work has not been completed yet.
|
FIR05-00841
| INSP-Final Inspection | 4/12/2006 | 4/13/2006 | 4/14/2006 8:01:46 AM | P | CANC |
|
|
Would it be possible to have this inspection around noon. James is the contact @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
BLD04-00469
| BLD-Final | 4/12/2006 | 4/13/2006 | 4/13/2006 2:03:52 PM | A | FAIL |
|
|
Clint; Phone #: ###-#### Repair the exit signs/emergency lights in the warehouse area, the exit signs in the office need repaired or removed, Remove the thumbturn from the main exit and provide indicator and sticker, remoe the dead bolts from the warehouse exterior doors, provide racking permit for racking over 8' and the storage over 12' see review notes #1 and #19, provide fire extinguishers per fire review comment #7, provide code compliant fire sprinkler monitoring system per review comment #15, provide knox box per review comment #6. Owner needs to review comments #16 through #26 for high piled storage requirements.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 4/12/2006 | 4/13/2006 | 4/13/2006 1:33:56 PM | A | PASS |
|
|
Hangers on third floor connecting corridor are ok.
|
BLD04-00640
| FIRE-Final Inspection | 4/12/2006 | 4/13/2006 | 4/13/2006 10:36:57 AM | A | PASS |
|
|
Life safety finaled
|
FIR05-00104
| INSP-Final Inspection | 4/12/2006 | 4/13/2006 | 4/13/2006 10:36:24 AM | A | PASS |
|
|
Fire alarm permit finaled
|
BLD03-01575
| FIRE-Final Inspection | 4/5/2006 | 4/13/2006 | 4/13/2006 8:55:39 AM | A | PASS |
|
|
fire life safety finaled
|