ELE09-00611
| Conference | 4/13/2009 | 4/13/2009 | 4/13/2009 3:59:05 PM | P | DONE |
|
|
Ufer ground not installed at time of foundatian installation. Need advise on solution. Bill Zerfas Phone #: ###-#### Internet Inspection Request from: William Zerfas t/w bill he needs 20ft of #4 cu wire inspection then 2inch concrete & another inspection
|
ELE09-00453
| Electrical Rough-In | 4/13/2009 | 4/13/2009 | 4/13/2009 1:28:36 PM | P | CANC |
|
|
George- late PM please Phone #: ###-#### george called & cancelled
|
ELE09-00416
| Electrical Rough-In | 4/10/2009 | 4/13/2009 | 4/13/2009 10:29:41 AM | A | CANC |
|
|
Grid cieling inspection. Phone #: ###-#### Internet Inspection Request from: Alan Lusk t/w alan job not ready
|
ELE09-00453
| Electrical Rough-In | 4/10/2009 | 4/13/2009 | 4/13/2009 10:28:52 AM | A | NR |
|
|
George Phone #: ###-#### the make up not completed no esc permit in project
|