Inspections for the day of: Monday, April 13, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-01365 Site Final4/13/20094/13/20094/13/2009 5:04:03 PMPPASS
ESC07-01125 Site Final4/13/20094/13/20094/13/2009 4:17:18 PMPPASS
Bob Phone #: ###-####
ESC09-00068 Site Preparation4/13/20094/13/20094/13/2009 4:04:19 PMADONE
Work is complete.
ESC09-00068 Site Final4/13/20094/13/20094/13/2009 4:04:00 PMPPASS
ESC07-00987 Random Inspection4/13/20094/13/20094/13/2009 4:03:15 PMAFAIL
Verbal to RP:
Clean up all trash debris on site. Also clean up minor foot tracking off of the West entrance. Will re-inspect on 4/15/09
ESC07-00326 Site Preparation4/10/20094/13/20094/13/2009 3:43:41 PMPPART
Discussed with RP over disturbed area next to canal. RP explained to me that he will be spreading mulch along the area's next to the canal for ground coverage.
ESC08-01003 Random Inspection4/13/20094/13/20094/13/2009 3:17:49 PMPFAIL
Verbal to RP:
Post the ESC sign at the front access of the park where activities are occuring. Will re-inspect on 4/14/09 AM
ESC08-00684 Site Final4/13/20094/13/20094/13/2009 2:54:20 PMPPASS
Kenny Phone #: ###-####
ESC04-00045 Site Final4/13/20094/13/20094/13/2009 11:48:49 AMPPASS
All stabilized
ESC09-00118 Random Inspection4/13/20094/13/20094/13/2009 11:47:49 AMPPASS
Permit not established for building but site looks good since demo permit was finaled.
ESC09-00096 Tracking Control4/13/20094/13/20094/13/2009 11:40:51 AMAFAIL
Verbal message to RP:
Clean up all foot tracking off of the hard surfaces infront of the lot by the end of the day. Will re-inspect on 4/14/09 PM.
ESC09-00102 Random Inspection4/6/20094/13/20094/13/2009 11:18:01 AMAPART
Left message with RP:
Asked to discuss over construction entrance and placement of washout pit. Either need to relocate washout pit or widen entrance of the project. Also need to post sign for washout pit.
ESC08-01050 BMP Violation4/13/20094/13/20094/13/2009 10:35:05 AMAFAIL
Verbal to RP:
Provide a concrete washout pit for prior to any further concrete pours on site. Clean up concrete spoils from washing out into a proper washout pit once provided. Will re-inspect on 04/15/09 AM.
ESC09-00045 General Inspection4/13/20094/13/20094/13/2009 9:40:53 AMAFAIL
Verbal to RP:
Clean up gutterpan to the south of entrance off of Yamhill of all sediment that leads to the storm drain. Also maintain storm drain protection. Will re-inspect on 4/14/09 PM.
ESC08-00706 BMP Violation4/13/20094/13/20094/13/2009 8:50:58 AMAFAIL
Correction Notice to RP:
1.Clean up all hard surface of all sediment and debris, (where the plan amendment is not alocated for).
2. Clean up all trash debris through out project area.
3. Install new sediment barriersat the south west access area where the barrier has been ripped and falling apart.
Will re-inspect 4/14/09 10am.