BLD10-00553
| FIRE-Final Inspection | 4/13/2010 | 4/13/2010 | 4/13/2010 5:01:13 PM | P | PASS |
|
|
Correction item verified for completion, life safety final approved.
|
BLD10-00702
| FIRE-Final Inspection | 4/12/2010 | 4/13/2010 | 4/13/2010 5:00:08 PM | P | PASS |
|
|
Fire life safety inspection passed, noted upgrade agreement for the adjacent tenant is due for completion April 22, 2011.
|
BLD10-00622
| FIRE-Conference | 4/13/2010 | 4/13/2010 | 4/13/2010 4:57:39 PM | P | DONE |
|
|
Discussion with contractor regarding project related fire alarm work due to remodel and pending FA permit.
|
BLD09-01992
| FIRE-Conference | 4/13/2010 | 4/13/2010 | 4/13/2010 4:56:16 PM | P | DONE |
|
|
On site meeting with contractor regarding fire department access, BO and FM agreement letter, and appendix D IFC 2006.
|
FIR10-00153
| INSP-Sprinkler Rough-in | 4/12/2010 | 4/13/2010 | 4/13/2010 4:47:59 PM | A | PART |
|
|
Overhead modifications for the fire sprinkler system at the tenant remodel area are approved for cover.
|
BLD09-00516
| FIRE-Final Inspection | 4/9/2010 | 4/13/2010 | 4/13/2010 4:46:12 PM | A | FAIL |
|
|
Missing one EM light per plan sheet E2.1, door hardware at two locations is not yet installed due to paint finishes underway, building address numbers are not posted. Note, the PFE is due annual certification this month.
|