PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, April 13, 2010
.
Number of inspections:
7
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC09-00352
General Inspection
4/13/2010
4/13/2010
4/13/2010 2:37:18 PM
P
CANC
ESC07-00154
Aging Inspection
4/13/2010
4/13/2010
4/13/2010 1:51:53 PM
DONE
ESC07-00154
DOC - Permit Expired
4/13/2010
4/13/2010
4/13/2010 1:51:45 PM
P
PASS
ESC07-00109
Aging Inspection
4/13/2010
4/13/2010
4/13/2010 1:28:52 PM
PASS
Site is in the vertical phase. All developement work is complete but project is under construction.
ESC09-00352
Site Preparation
4/13/2010
4/13/2010
4/13/2010 10:12:49 AM
P
PART
Pedestrian Bridge
Thay have bermed up the area where the activity is going to occur. Also turbid water has breeched the turbidity curtain. But the flow is so stagnent that it will no reach the recieving water body. Have set a marker point within that creek a the property line marker. If turbid water reaches that point after going past the curtain and also the beaver damn, then a different plan must be developed to miniumizes the turbidity within the creek. Will re-inspect in the PM today.
ESC08-00924
Site Preparation
4/12/2010
4/13/2010
4/13/2010 10:12:14 AM
A
PART
Pedestrian Bridge
That have bermed up the area where the activity is going to occur. Also turbid water has breeched the turbidity curtain. But the flow is so stagnent that it will no reach the recieving water body. Have set a marker point within that creek a the property line marker. If turbid water reaches that point after going past the curtain and also the beaver damn, then a different plan must be developed to miniumizes the turbidity within the creek. Will re-inspect in the PM today.
ESC10-00010
General Inspection
4/7/2010
4/13/2010
4/13/2010 9:53:21 AM
A
PART
They will be using a seed, tach, mulch application on the slopes of the channel. Also requiring an approved blanket over the top of the application to hold the seed on the banks.