Inspections for the day of: Tuesday, April 13, 2010.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00352 General Inspection4/13/20104/13/20104/13/2010 2:37:18 PMPCANC
ESC07-00154 Aging Inspection4/13/20104/13/20104/13/2010 1:51:53 PM DONE
ESC07-00154 DOC - Permit Expired4/13/20104/13/20104/13/2010 1:51:45 PMPPASS
ESC07-00109 Aging Inspection4/13/20104/13/20104/13/2010 1:28:52 PM PASS
Site is in the vertical phase. All developement work is complete but project is under construction.
ESC09-00352 Site Preparation4/13/20104/13/20104/13/2010 10:12:49 AMPPART
Pedestrian Bridge

Thay have bermed up the area where the activity is going to occur. Also turbid water has breeched the turbidity curtain. But the flow is so stagnent that it will no reach the recieving water body. Have set a marker point within that creek a the property line marker. If turbid water reaches that point after going past the curtain and also the beaver damn, then a different plan must be developed to miniumizes the turbidity within the creek. Will re-inspect in the PM today.
ESC08-00924 Site Preparation4/12/20104/13/20104/13/2010 10:12:14 AMAPART
Pedestrian Bridge

That have bermed up the area where the activity is going to occur. Also turbid water has breeched the turbidity curtain. But the flow is so stagnent that it will no reach the recieving water body. Have set a marker point within that creek a the property line marker. If turbid water reaches that point after going past the curtain and also the beaver damn, then a different plan must be developed to miniumizes the turbidity within the creek. Will re-inspect in the PM today.
ESC10-00010 General Inspection4/7/20104/13/20104/13/2010 9:53:21 AMAPART
They will be using a seed, tach, mulch application on the slopes of the channel. Also requiring an approved blanket over the top of the application to hold the seed on the banks.