BLD15-00531
| BLD-Wall Bracing | 4/13/2015 | 4/13/2015 | 4/13/2015 8:50:07 PM | P | PASS |
|
|
Shear // Vince Phone #: ###-####
|
BLD15-00586
| BLD-Footing | 4/13/2015 | 4/13/2015 | 4/13/2015 3:56:34 PM | P | PASS |
|
|
Bill Phone #: ###-####
|
BLD15-00454
| BLD-Footing | 4/13/2015 | 4/13/2015 | 4/13/2015 3:02:37 PM | P | FAIL |
|
|
JR Phone #: ###-####,, need hillside report,, need reviewed plans to show rebar
|
BLD14-03579
| BLD-Energy code compliance | 4/13/2015 | 4/13/2015 | 4/13/2015 2:47:38 PM | P | PART |
|
|
above cooler/freezer box ceiling insulation only, early afternoon if possible, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, insulation ok,, ok to one side walls pending trades
|
BLD15-00256
| BLD-Blower Door Test Results | 4/10/2015 | 4/13/2015 | 4/13/2015 2:30:28 PM | A | PEND |
|
|
Colby Phone #: ###-####
|
BLD15-00394
| BLD-Framing/Rough-in | 4/10/2015 | 4/13/2015 | 4/13/2015 1:34:23 PM | A | FAIL |
|
|
Rob Phone #: ###-####,, correction posted on truss engineering page,, need to fix truss bracing issues,, strap the top plate above the fireplace,, add blocking at truss bearing locations per structural engineering,, add OSB brace panels or justify on interior walls,, etc. (can insulate walls if needed)
|
BLD15-00525
| BLD-Framing/Rough-in | 4/10/2015 | 4/13/2015 | 4/13/2015 12:31:34 PM | A | PASS |
|
|
Cobly Phone #: ###-####,, ok to insulate
|
BLD14-02941
| BLD-Framing/Rough-in | 4/10/2015 | 4/13/2015 | 4/13/2015 12:03:39 PM | A | PART |
|
|
John Phone #: ###-####,, working on c/n now,, still need seal pack
|