BLD14-02689
| FIRE-Final Inspection | 4/13/2015 | 4/13/2015 | 4/13/2015 3:26:37 PM | P | PASS |
|
|
Life safety passed
|
FIR14-00853
| INSP-Final Inspection | 4/13/2015 | 4/13/2015 | 4/13/2015 3:24:47 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00923
| INSP-Sprinkler Rough-in/Hydro | 4/13/2015 | 4/13/2015 | 4/13/2015 2:23:06 PM | P | PART |
|
|
24 hour air test started on dry system at 2pm with 43 psi on the guage.
|
FIR14-00923
| INSP-Sprinkler Rough-in/Hydro | 4/10/2015 | 4/13/2015 | 4/13/2015 2:21:49 PM | A | PASS |
|
|
Overhead 200lb hydro for the wet and dry systems passed. Overhead rough-in for the wet and dry systems passed.
|
BLD15-00411
| FIRE-Final Inspection | 4/10/2015 | 4/13/2015 | 4/13/2015 8:53:13 AM | A | PASS |
|
|
Life safety passed. Two doors have been relocated. One has single action hardware provide but the other does not. Both doors to have the single action hardware prior to a building inspection.
|