Inspections for the day of: Thursday, April 13, 2017.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-00966 BLD-Final4/12/20174/13/20174/13/2017 3:50:37 PMPDONE
Phone #: ###-#### Inspection requested via web by mark bedard
BLD17-00966 DOC - Permit Finaled4/13/20174/13/20174/13/2017 3:50:20 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD16-03241 BLD-Energy code compliance4/12/20174/13/20174/13/2017 3:27:33 PMPPASS
Insulation // Bruce Phone #: ###-####
BLD17-00757 BLD-Final4/12/20174/13/20174/13/2017 2:53:50 PMPPASS
call Dustin prior to going out Phone #: ###-####. Ok for perm occ.
BLD17-00463 BLD-Wall cover4/13/20174/13/20174/13/2017 2:03:05 PMPPART
Nate Phone #: ###-####. Exterior wall bracing ok. Did note some tore OSB from crane that needs to be removed and replaced. Noted to framers on site that wall bracing is ok, but to replace OSB and will check on framing inspection.
ESC17-00257 Site Preparation4/13/20174/13/20174/13/2017 1:44:00 PMPPASS
BLD17-00637 BLD-Footing4/12/20174/13/20174/13/2017 1:43:39 PMPPASS
Dane Phone #: ###-####
BLD17-00896 BLD-Framing/Rough-in4/13/20174/13/20174/13/2017 1:22:21 PMPPASS
Tim Phone #: ###-####
BLD16-03666 BLD-Framing/Rough-in4/12/20174/13/20174/13/2017 12:30:04 PMAPASS
Roof nailing on porte cachere ok.
BLD16-04536 BLD-Conference4/12/20174/13/20174/13/2017 10:15:07 AMANR
Adam Phone #: ###-####
BLD16-03923 BLD-Final4/12/20174/13/20174/13/2017 9:28:34 AMAPASS
Hans Phone #: ###-####
BLD16-03923 DOC - Permit Finaled4/13/20174/13/20174/13/2017 9:28:25 AMPPASS
BLD16-04194 BLD-Final4/12/20174/13/20174/13/2017 8:38:41 AMAPASS
would like call ahead; Jamie Phone #: ###-####
BLD16-04480 BLD-Conference4/12/20174/13/20174/13/2017 8:04:36 AMADONE
Phone #: ###-#### Inspection requested via web by Nicholas Miller. question regarding the sprinkler system being energized prior to vertical construction. Refered to fire.