BLD19-01478
| BLD-Concrete | 4/13/2020 | 4/13/2020 | 4/14/2020 2:18:47 PM | P | PASS |
|
|
LEVEL 5 - POUR AREA A - PT DECK. COLUMNS @ EAST SIDE LEVEL 4-5 AND LEVEL 4 - NORTH SHEAR WALL. Phone #: ###-#### Inspection requested via web by Garrett Camp
|
BLD19-04969
| BLD-Other | 4/13/2020 | 4/13/2020 | 4/13/2020 1:20:23 PM | P | PASS |
|
|
Soffit. Can you do this morning when you inspect 22-2 HN? Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD20-00869
| BLD-Footing | 4/13/2020 | 4/13/2020 | 4/13/2020 1:20:07 PM | P | PASS |
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD19-02813
| BLD-Final | 4/13/2020 | 4/13/2020 | 4/13/2020 12:22:40 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD19-02813
| DOC - Permit Finaled | 4/13/2020 | 4/13/2020 | 4/13/2020 12:22:30 PM | P | PASS |
|
|
|
BLD19-02813
| BLD-Blower Door Test Results | 4/13/2020 | 4/13/2020 | 4/13/2020 12:22:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon 4.7
|
BLD18-03143
| BLD-Wall cover | 4/13/2020 | 4/13/2020 | 4/13/2020 10:31:55 AM | A | PASS |
|
|
Putty packs level 6 and secondary framing level 2. Call Adam before heading to site. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD20-00631
| BLD-Wall Bracing | 4/10/2020 | 4/13/2020 | 4/13/2020 9:45:24 AM | A | PASS |
|
|
Mark Phone #: ###-####
|
BLD19-03548
| BLD-Wall Bracing | 4/10/2020 | 4/13/2020 | 4/13/2020 9:29:54 AM | A | PASS |
|
|
Les - Screened for covid 19 symptoms Phone #: ###-####
|
BLD20-00113
| BLD-Framing/Rough-in | 4/13/2020 | 4/13/2020 | 4/13/2020 9:09:13 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD19-03419
| BLD-Framing/Rough-in | 4/8/2020 | 4/13/2020 | 4/13/2020 8:14:28 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Gus Brandon Inspection cancelled from web by: Gus Brandon
|