BLD18-01027
| BLD-Conference | 4/1/2020 | 4/8/2020 | | A | |
|
|
|
BLD20-00517
| BLD-Foundation | 4/10/2020 | 4/13/2020 | 4/13/2020 2:32:58 PM | P | PART |
|
|
Pat *left voicemail* Phone #: ###-####
|
BLD20-00516
| BLD-Foundation | 4/10/2020 | 4/13/2020 | 4/13/2020 2:32:46 PM | P | PART |
|
|
Pat *left voicemail* Phone #: ###-####
|
BLD20-00514
| BLD-Foundation | 4/10/2020 | 4/13/2020 | 4/13/2020 2:32:30 PM | P | PART |
|
|
Pat *left voicemail* Phone #: ###-####
|
BLD19-04952
| BLD-Framing/Rough-in | 4/13/2020 | 4/13/2020 | 4/13/2020 1:45:39 PM | P | NR |
|
|
stated no one should be onsite // Tyler Phone #: ###-####. A mech rough in inspection is required prior to framing inspection. Air seal pack also required to be completed prior to framing inspection.
|
BLD20-00273
| BLD-Wall Bracing | 4/13/2020 | 4/13/2020 | 4/13/2020 1:10:40 PM | P | PASS |
|
|
screened shear // Nicholas Phone #: ###-####. All issues resolved.
|
BLD20-00295
| BLD-Footing | 4/10/2020 | 4/13/2020 | 4/13/2020 1:02:35 PM | P | PASS |
|
|
Rod Phone #: ###-####. Perimeter footings ok.
|
BLD19-04920
| BLD-Foundation | 4/13/2020 | 4/13/2020 | 4/13/2020 10:27:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter. Reinforcement for inteior slab on grade.
|
BLD18-04519
| BLD-Framing/Rough-in | 4/10/2020 | 4/13/2020 | 4/13/2020 10:06:10 AM | A | PASS |
|
|
Building 10 Framing Inspection, C3 truss bearing point truss-manufacturer "No Repair Needed", drawing confirmation. Phone #: ###-#### Inspection requested via web by Bob Goodwin. Per the truss engineer, no repair is required for the missed C3 truss bearing location.
|
BLD18-04520
| BLD-Framing/Rough-in | 4/10/2020 | 4/13/2020 | 4/13/2020 10:04:38 AM | A | PASS |
|
|
Ceiling drops framing inspection for cover, Building 11 - Tower 3 (12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD20-01025
| BLD-Footing | 4/10/2020 | 4/13/2020 | 4/13/2020 9:06:37 AM | A | PASS |
|
|
John - Screened for Covid 19 symptoms Phone #: ###-####. East stemwall only ok.
|
BLD20-00792
| BLD-Final | 4/10/2020 | 4/13/2020 | 4/13/2020 8:46:44 AM | A | PASS |
|
|
Peri - Phone #: ###-####. Ok for perm occ.
|
BLD20-00968
| BLD-Footing | 4/11/2020 | 4/13/2020 | 4/13/2020 8:37:08 AM | A | PASS |
|
|
As early as possible Phone #: 2087572173 >> Inspection requested via mobile web by NATE BARNARD
|
BLD20-01049
| BLD-Other | 4/10/2020 | 4/13/2020 | 4/13/2020 8:30:14 AM | A | DONE |
|
|
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-01049
| DOC - Permit Finaled | 4/13/2020 | 4/13/2020 | 4/13/2020 8:30:01 AM | P | PASS |
|
|
All work appeared to be done in acccordance with local codes and ordinances.
|