ELE97-00602
| INSP - Final | 4/11/1997 | 4/14/1997 | 4/14/1997 12:00:00 AM | A | CANC |
|
|
04/13/97 403 - WIRING PROBLEMS WITH LIGHTING...MB
|
ELE97-01128
| INSP - Ele Rough-In/Perm Svc | 4/10/1997 | 4/14/1997 | 4/14/1997 12:00:00 AM | A | NR |
|
|
04/13/97 403 - WILL RESCHEDULE...MB
|
ELE97-01128
| INSP - Ele Rough-In/Perm Svc | 4/14/1997 | 4/14/1997 | 4/14/1997 12:00:00 AM | P | PASS |
|
|
04/14/97 403 -
|
ELE97-01153
| INSP - Conference | 4/14/1997 | 4/14/1997 | 4/14/1997 12:00:00 AM | P | PASS |
|
|
04/14/97 403 - said you were going to meet with him at 1 o'clock
|
ELE97-00629
| INSP - Final | 4/14/1997 | 4/14/1997 | 4/14/1997 12:00:00 AM | P | PASS |
|
|
04/14/97 403 -
|
ELE96-03840
| INSP - Electrical Rough-In | 4/14/1997 | 4/14/1997 | 4/14/1997 12:00:00 AM | P | PART |
|
|
04/14/97 403 - 1ST FLOOR SOUTHEAST PERIMETER...MB
|
ELE96-04136
| INSP - Electrical Rough-In | 4/14/1997 | 4/14/1997 | 4/14/1997 12:00:00 AM | P | PART |
|
|
04/14/97 403 - 2ND FLOOR CENTER CORE...MB
|
ELE97-00298
| INSP - Final | 4/14/1997 | 4/14/1997 | 4/14/1997 12:00:00 AM | P | FAIL |
|
|
04/14/97 403 - NEC: 210-8(A)(1). BATHROOM/MASTER, RECEPTICLE SHALL HAVE BCC: 4/WAY SWITCH INOPERATIVE...MB
|
ELE97-00602
| INSP - Final | 4/14/1997 | 4/14/1997 | 4/14/1997 12:00:00 AM | P | PART |
|
|
04/14/97 403 - LATE PM TODAY PLEASE 1 ST FLOOR UNION BLOCK ROOF TOP HVAC UNITS...MB
|