ELE98-03567
| Final | 4/13/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/13/2000 at 07:59:01. Contact: ###-####. 2nd floor; areas 'A' & 'B'; temp. occ. 4/14/00 1:40:35 PM
|
ELE00-01295
| Final | 4/13/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | A | FAIL |
|
|
###-#### NEC: 250-104 (b). Shall bond to gas piping. 4/14/00 1:41:23 PM
|
ELE00-00257
| Final | 4/13/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | A | PASS |
|
|
###-#### call Charlie for access Completed 4/17/00 9:22:39 AM
|
ELE00-01307
| Rough-In Permanent Service | 4/13/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
ELE00-00669
| Electrical Rough-In | 4/13/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | A | PART |
|
|
###-#### conf only Conference: securing MC cable; recepticles in kitchen 4/14/00 1:40:11 PM
|
ELE00-00980
| Final | 4/14/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | P | PASS |
|
|
###-#### call first Completed 4/17/00 9:22:49 AM
|
ELE99-04479
| Electrical Rough-In | 4/14/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | P | PART |
|
|
###-#### Walls Ele. R/I; demising wall (auditorium) 4/17/00 9:23:42 AM
|
ELE00-01317
| Electrical Rough-In | 4/14/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | P | PART |
|
|
Todd ###-#### Walls Ele. R/I 4/17/00 9:23:14 AM
|
ELE00-01318
| Permanent Service | 4/14/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | P | FAIL |
|
|
###-#### john shop Guy kit on mast shall be required; metal water pipe shall be bonded. 4/17/00 11:34:28 AM
|
ELE00-00149
| Electrical Rough-In | 4/13/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | P | PART |
|
|
###-#### level 2 Interior bathroom walls Ele. R/I; 2nd floor 4/17/00 9:23:07 AM
|
ELE00-01274
| Electrical Rough-In | 4/12/2000 | 4/14/2000 | 4/14/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/12/2000 at 09:26:02. Contact: ###-####. Interior walls ele. R/I 4/17/00 9:23:25 AM
|