Inspections for the day of: Monday, April 14, 2003.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01269 BLD-Conference4/11/20034/14/20034/14/2003 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 4/11/2003 at 11:45:46 AM. Contact: ###-####.
had to take mother to doctor, re-schedule for pm 4/14/2003 11:12:49 AM
BLD03-00043 BLD-Energy code compliance4/13/20034/14/20034/14/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/13/2003 at 11:23:00 PM. Contact: ###-####.
frame ok and insulation in walls ok, ok to cover,, need new energy compliance report at final for " as built" 4/14/2003 11:10:05 AM
BLD01-03251 BLD-Conference4/14/20034/14/20034/14/2003 12:00:00 AMAPART
Ready for final inspection pending final on subs. Want to do a walk through to know if I need to do anything else. Please call first so I can meet you there. Thanks; Phone #: ###-#### Internet Inspection Request from: Richard Fritzley
walk through w/ owner on final 4/14/2003 9:38:04 AM
BLD03-00157 BLD-Framing/Rough-in4/14/20034/14/20034/14/2003 12:00:00 AMPFAIL
###-####- brent
c/n posted 4/14/2003 3:19:33 PM
BLD02-02793 BLD-Conference4/14/20034/14/20034/14/2003 12:00:00 AMPPART
russ please call before ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
walk through on framing 4/14/2003 3:51:45 PM
BLD03-00581 BLD-Footing4/14/20034/14/20034/14/2003 12:00:00 AMPPART
LOGAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
wip, pending soil pass 4/14/2003 3:23:44 PM
BLD03-00150 BLD-Energy code compliance4/14/20034/14/20034/14/2003 12:00:00 AMPPASS
DUSTY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
MEC03-00597 Rough-in4/14/20034/14/20034/14/2003 12:00:00 AMPFAIL
re-inspection fee imposed,,,, 1st c/n not complete 4/14/2003 3:21:12 PM