ELE05-01974
| DOC - Permit Finaled | 4/14/2006 | 4/14/2006 | 4/14/2006 4:03:38 PM | P | PASS |
|
|
|
ELE05-02110
| DOC - Permit Finaled | 4/14/2006 | 4/14/2006 | 4/14/2006 3:22:58 PM | P | PASS |
|
|
|
ELE05-02111
| DOC - Permit Finaled | 4/14/2006 | 4/14/2006 | 4/14/2006 3:03:25 PM | P | PASS |
|
|
|
ELE06-01168
| Electrical Rough-In | 4/14/2006 | 4/14/2006 | 4/14/2006 2:47:54 PM | P | PART |
|
|
James; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong R/I Ok except fir-down ceiling
|
ELE06-00825
| Electrical Rough-In | 4/14/2006 | 4/14/2006 | 4/14/2006 2:25:50 PM | P | CANC |
|
|
bonding grid around pool if i can get inspection as late this afternoon as possible trying to pour concrete monday thanks pat; Phone #: ###-#### Internet Inspection Request from: joe wheeler ran out of re-bar will reschedual
|
ELE05-04132
| Electrical Rough-In | 4/14/2006 | 4/14/2006 | 4/14/2006 2:13:55 PM | P | PART |
|
|
James -- ceiling; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong front ceiling ok
|
ELE06-01258
| Electrical Rough-In | 4/14/2006 | 4/14/2006 | 4/14/2006 1:34:12 PM | P | PASS |
|
|
Butch; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Bathroom R/I Ok
|
ELE06-01229
| Temporary Service | 4/13/2006 | 4/14/2006 | 4/14/2006 11:10:55 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: William Zerfas T/S O/H Ok
|
ELE06-01287
| Temporary Service | 4/13/2006 | 4/14/2006 | 4/14/2006 10:31:15 AM | A | PASS |
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong T/S O/H Ok
|
ELE06-01227
| Final | 4/10/2006 | 4/14/2006 | 4/14/2006 9:59:33 AM | A | PASS |
|
|
We upgraded the service and panel to 200 amps, new ground rods and bonded to water.(#6030299mm).Thanks!!!!Jman/Craig/###-####.; Phone #: ###-####
|
ELE06-01227
| Permanent Service | 4/14/2006 | 4/14/2006 | 4/14/2006 9:59:25 AM | P | PASS |
|
|
We upgraded the service and panel to 200 amps, new ground rods and bonded to water.(#6030299mm).Thanks!!!!Jman/Craig/###-####.; Phone #: ###-#### P/S O/H R Ok
|
ELE06-01105
| Permanent Service | 4/13/2006 | 4/14/2006 | 4/14/2006 8:56:31 AM | A | PART |
|
|
Footing needs inspected for ground.; Phone #: ###-#### Internet Inspection Request from: Latisha Peltier Electrode is ok for concrete. remove main bonding jumper from sub panel and run grounding electrode conductor through the connector.
|
ELE06-01292
| Final | 4/14/2006 | 4/14/2006 | 4/14/2006 8:29:44 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Holbrook Inspection cancelled from web by: Todd Holbrook
|
ELE06-01257
| Electrical Rough-In | 4/13/2006 | 4/14/2006 | 4/14/2006 8:18:48 AM | A | PASS |
|
|
###-#### WAYNE nOTE: PLEASE CALL 1/2 HR; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles R/I and U/G to hot tub ok
|
ELE05-04132
| Electrical Rough-In | 4/13/2006 | 4/14/2006 | 4/14/2006 12:00:00 AM | A | CANC |
|
|
James -- ceiling; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong /// Cancel and reschedule for 4-14 PM per James (Romar Electric) 4-14-06 eus
|