Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02618 FIRE-Conference4/3/20064/10/2006 P 
Follow-up on correction notice. One week was given to start work ending on 4/10/06.
BLD02-02216 FIRE-Conference4/3/20064/10/2006 P 
Follow-up on correction notice. One week was given to start work ending on 4/10/06.
FIR05-00775 FIR-Aging Inspection4/14/20064/14/20064/17/2006 3:13:26 PM NR
Per Orlen work is still in progress
BLD04-00709 BLD-Aging Inspection4/14/20064/14/20064/17/2006 10:51:02 AM NR
I received a phone call from CM Company today and the lady stated that the door locks would be blanked off.
FIR05-00850 INSP-Sprinkler Rough-in4/13/20064/14/20064/14/2006 4:32:06 PMPPASS
A remaining underground supply piping is ok to cover.
BLD05-03348 FIRE-Final Inspection4/14/20064/14/20064/14/2006 4:31:34 PMPFAIL
Provide annual tag for the fire extinguisher as per the review notes and provide approved door hardware per notes #7 and #8 as stated on the previous correction notice.
FIR05-00586 INSP-Sprinkler Rough-in/Hydro4/13/20064/14/20064/14/2006 2:05:37 PMAPASS
Above ground hydro test passed.
FIR05-00297 INSP-Sprinkler Rough-in/Hydro4/13/20064/14/20064/14/2006 1:21:36 PMAPART
Fourth floor hydro test passed. Basement hydro test failed.
FIR05-00841 INSP-Final Inspection4/13/20064/14/20064/14/2006 10:56:24 AMAFAIL
No city approved plans on site for inspection. The pendant head in the kitchen still exceeds 10' from the exterior wall. Pendant head in the upper bedroom exceeds 10' from wall. Light and ceiling fans are obstructing pendants in upper and lower bedrooms. Pendant head in den is blocked by arched entry into small connecting foyer (must be atleast 6' away). Need to pipe drain to exterior and provide correct orfice for testing. Underground has not been flushed yet. There may be other items that are addressed on the approved plans but was unable to verify due to missing plans.
FIR06-00209 INSP-Sprinkler Rough-in/Hydro4/12/20064/14/20064/14/2006 10:49:24 AMAPASS
Inspection was for the rough-in of the drops and hangers. No pendants have been installed yet and their individual armovers will need to be inspected prior to all tile being installed.
FIR06-00230 INSP-Sprinkler Rough-in/Hydro4/12/20064/14/20064/14/2006 10:49:02 AMAPASS
Inspection was for the rough-in of the drops and hangers. No pendants have been installed yet and their individual armovers will need to be inspected prior to all tile being installed.