BLD02-02618
| FIRE-Conference | 4/3/2006 | 4/10/2006 | | P | |
|
|
Follow-up on correction notice. One week was given to start work ending on 4/10/06.
|
BLD02-02216
| FIRE-Conference | 4/3/2006 | 4/10/2006 | | P | |
|
|
Follow-up on correction notice. One week was given to start work ending on 4/10/06.
|
FIR05-00775
| FIR-Aging Inspection | 4/14/2006 | 4/14/2006 | 4/17/2006 3:13:26 PM | | NR |
|
|
Per Orlen work is still in progress
|
BLD04-00709
| BLD-Aging Inspection | 4/14/2006 | 4/14/2006 | 4/17/2006 10:51:02 AM | | NR |
|
|
I received a phone call from CM Company today and the lady stated that the door locks would be blanked off.
|
FIR05-00850
| INSP-Sprinkler Rough-in | 4/13/2006 | 4/14/2006 | 4/14/2006 4:32:06 PM | P | PASS |
|
|
A remaining underground supply piping is ok to cover.
|
BLD05-03348
| FIRE-Final Inspection | 4/14/2006 | 4/14/2006 | 4/14/2006 4:31:34 PM | P | FAIL |
|
|
Provide annual tag for the fire extinguisher as per the review notes and provide approved door hardware per notes #7 and #8 as stated on the previous correction notice.
|
FIR05-00586
| INSP-Sprinkler Rough-in/Hydro | 4/13/2006 | 4/14/2006 | 4/14/2006 2:05:37 PM | A | PASS |
|
|
Above ground hydro test passed.
|
FIR05-00297
| INSP-Sprinkler Rough-in/Hydro | 4/13/2006 | 4/14/2006 | 4/14/2006 1:21:36 PM | A | PART |
|
|
Fourth floor hydro test passed. Basement hydro test failed.
|
FIR05-00841
| INSP-Final Inspection | 4/13/2006 | 4/14/2006 | 4/14/2006 10:56:24 AM | A | FAIL |
|
|
No city approved plans on site for inspection. The pendant head in the kitchen still exceeds 10' from the exterior wall. Pendant head in the upper bedroom exceeds 10' from wall. Light and ceiling fans are obstructing pendants in upper and lower bedrooms. Pendant head in den is blocked by arched entry into small connecting foyer (must be atleast 6' away). Need to pipe drain to exterior and provide correct orfice for testing. Underground has not been flushed yet. There may be other items that are addressed on the approved plans but was unable to verify due to missing plans.
|
FIR06-00209
| INSP-Sprinkler Rough-in/Hydro | 4/12/2006 | 4/14/2006 | 4/14/2006 10:49:24 AM | A | PASS |
|
|
Inspection was for the rough-in of the drops and hangers. No pendants have been installed yet and their individual armovers will need to be inspected prior to all tile being installed.
|
FIR06-00230
| INSP-Sprinkler Rough-in/Hydro | 4/12/2006 | 4/14/2006 | 4/14/2006 10:49:02 AM | A | PASS |
|
|
Inspection was for the rough-in of the drops and hangers. No pendants have been installed yet and their individual armovers will need to be inspected prior to all tile being installed.
|