ESC08-00627
| Site Final | 4/13/2009 | 4/14/2009 | 4/15/2009 3:37:26 PM | P | PASS |
|
|
|
BLD09-00336
| BLD-Framing/Rough-in | 4/14/2009 | 4/14/2009 | 4/14/2009 4:58:37 PM | P | PART |
|
|
Jack Phone #: ###-#### exterior shear ok
|
BLD09-00349
| BLD-Framing/Rough-in | 4/14/2009 | 4/14/2009 | 4/14/2009 4:40:01 PM | P | PART |
|
|
Phone #: ###-#### need mech sign off 1st,, frame walk through,, ok to insulate after mech. pass,, need straps, fireblocks,, stairs not in yet
|
BLD08-02307
| BLD-Wall cover | 4/13/2009 | 4/14/2009 | 4/14/2009 1:17:57 PM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: SHANE JAYO,, exterior shear, exteriorior ok
|
BLD09-00241
| BLD-Foundation | 4/14/2009 | 4/14/2009 | 4/14/2009 1:13:24 PM | P | PART |
|
|
ben Phone #: ###-#### wip on basement wall rebar,, ok so far, per engineering
|
BLD09-00408
| BLD-Final | 4/13/2009 | 4/14/2009 | 4/14/2009 12:25:31 PM | A | PASS |
|
|
Jeff Phone #: ###-####
|
BLD09-00408
| DOC - Permit Finaled | 4/14/2009 | 4/14/2009 | 4/14/2009 12:02:02 PM | P | PASS |
|
|
|
BLD08-01787
| BLD-Final | 4/13/2009 | 4/14/2009 | 4/14/2009 11:58:08 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/13/2009 at 10:46:05 AM.
|
BLD08-01787
| DOC - Permit Finaled | 4/14/2009 | 4/14/2009 | 4/14/2009 11:58:01 AM | P | PASS |
|
|
|
BLD09-00076
| BLD-Conference | 4/10/2009 | 4/14/2009 | 4/14/2009 10:56:44 AM | A | PASS |
|
|
Christophe Phone #: ###-#### conf . w/ trade inspectors, owners agent,, trade people,, will need to open walls, will need structural engineer report
|