Inspections for the day of: Wednesday, April 14, 2010.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00279 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:47:49 PMPNR
Jim-Fire wall inspection please Phone #: ###-####
BLD10-00278 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:47:30 PMPNR
Jim-Fire wall inspection please Phone #: ###-####
BLD10-00277 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:47:09 PMPNR
Jim-Fire wall inspection please Phone #: ###-####
BLD10-00276 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:46:54 PMPNR
Jim-Fire wall inspection please Phone #: ###-####
BLD10-00179 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:24:33 PMPPASS
Jim-Fire wall inspection please Phone #: ###-####. Verified fire rated plywood at laydown parapet at roof deck and also at overbuild areas.
BLD10-00178 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:24:08 PMPPASS
Jim-Fire wall inspection please Phone #: ###-####. Verified fire rated plywood at laydown parapet at roof deck and also at overbuild areas.
BLD10-00177 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:23:45 PMPPASS
Jim-Fire wall inspection please Phone #: ###-####. Verified fire rated plywood at laydown parapet at roof deck and also at overbuild areas.
BLD10-00176 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:23:09 PMPPASS
Jim-Fire wall inspection please Phone #: ###-####. Verified fire rated plywood at laydown parapet at roof deck and also at overbuild areas.
BLD10-00183 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:21:45 PMPFAIL
Jim Phone #: ###-####. Provide 36 inches at landings, bearing blocks at girder in garage, nail off all simpson hangars, complete lateral bracing. Provide 4 8d nails on all straps installed on either side.
BLD10-00182 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:21:20 PMPFAIL
Jim Phone #: ###-####. Provide 36 inches at landings, bearing blocks at girder in garage, nail off all simpson hangars, complete lateral bracing. Provide 4 8d nails on all straps installed on either side.
BLD10-00181 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:20:36 PMPFAIL
Jim Phone #: ###-####. Provide 36 inches at landings, bearing blocks at girder in garage, nail off all simpson hangars, complete lateral bracing. Provide 4 8d nails on all straps installed on either side.
BLD10-00180 BLD-Framing/Rough-in4/14/20104/14/20104/14/2010 4:19:58 PMPFAIL
Jim Phone #: ###-####. Provide 36 inches at landings, bearing blocks at girder in garage, nail off all simpson hangars, complete lateral bracing. Provide 4 8d nails on all straps installed on either side. Complete the double layer of 5/8 type x rock at soffit.
ESC10-00075 General Inspection4/14/20104/14/20104/14/2010 4:15:26 PMPPART
Needs to perform some general cleanup of jobsite and sweepsidewalks and gutterpan of silts and debrie.
ESC10-00074 General Inspection4/14/20104/14/20104/14/2010 4:15:04 PMPPART
Needs to perform some general cleanup of jobsite and sweepsidewalks and gutterpan of silts and debrie.
ESC10-00073 General Inspection4/14/20104/14/20104/14/2010 4:14:43 PMPPART
Needs to perform some general cleanup of jobsite and sweepsidewalks and gutterpan of silts and debrie.
ESC10-00072 General Inspection4/14/20104/14/20104/14/2010 4:14:15 PMPPART
Needs to perform some general cleanup of jobsite and sweepsidewalks and gutterpan of silts and debrie.
BLD10-00240 BLD-Energy code compliance4/14/20104/14/20104/14/2010 4:10:02 PMPPASS
Needs to block off vents to unfinished storage area or provide insulation.
BLD10-00240 BLD-Framing/Rough-in4/13/20104/14/20104/14/2010 4:08:27 PMPPASS
Randy Phone #: ###-####. All framing issues have been resolved. Contractor to leave engineering paperwork.
BLD10-00733 BLD-Final4/14/20104/14/20104/14/2010 4:06:39 PMPNR
Craig Phone #: ###-####. Life/safety failed.
ESC10-00102 BMP Violation4/14/20104/14/20104/14/2010 2:05:59 PMPPASS
All issues resolved. ok.
ESC06-00536 Aging Inspection4/14/20104/14/20104/14/2010 11:53:20 AM CANC
ESC06-00536 DOC - Permit Expired4/14/20104/14/20104/14/2010 11:53:15 AMAPASS
Final stabalization was completed. Permit is expired.
ESC05-00348 Aging Inspection4/14/20104/14/20104/14/2010 11:52:05 AM DONE
ESC05-00348 DOC - Permit Expired4/14/20104/14/20104/14/2010 11:51:56 AMAPASS
Final stabalization was completed. Permit is expired.
BLD10-00004 BLD-Energy code compliance4/13/20104/14/20104/14/2010 9:53:43 AMANR
Inspection requested from web by: Scott Zierler Phone #: ###-####
ESC05-01640 General Inspection4/14/20104/14/20104/14/2010 9:53:29 AMAPASS
BLD10-00004 BLD-Framing/Rough-in4/13/20104/14/20104/14/2010 9:53:06 AMAPART
please call for on onsite visit Inspection requested from web by: Scott Zierler Phone #: ###-####. ok to insulate. Needs to provide stud shoe at plumbing penetration.