PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, April 14, 2010
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC09-00812
Random Inspection
4/14/2010
4/14/2010
4/14/2010 4:11:02 PM
P
PART
liner has been put in place at the storm water out in the east end of Quinns Pond where erosion has occured. Liner within the channel still needs maintenance to occur where it has degrated.
ESC07-00198
Aging Inspection
4/14/2010
4/14/2010
4/14/2010 2:37:44 PM
DONE
ESC07-00198
DOC - Permit Finaled
4/14/2010
4/14/2010
4/14/2010 2:37:36 PM
P
PASS
ESC07-00197
Aging Inspection
4/14/2010
4/14/2010
4/14/2010 2:37:30 PM
DONE
ESC07-00197
DOC - Permit Finaled
4/14/2010
4/14/2010
4/14/2010 2:37:25 PM
P
PASS
ESC07-00196
Aging Inspection
4/14/2010
4/14/2010
4/14/2010 2:37:17 PM
DONE
ESC07-00196
DOC - Permit Finaled
4/14/2010
4/14/2010
4/14/2010 2:37:12 PM
P
PASS
ESC10-00280
Site Preparation
4/14/2010
4/14/2010
4/14/2010 2:18:51 PM
NR
ESC10-00277
Site Preparation
4/14/2010
4/14/2010
4/14/2010 1:55:17 PM
PASS
ESC10-00260
Site Preparation
4/14/2010
4/14/2010
4/14/2010 1:27:59 PM
PASS
ESC10-00267
Complaint Inspection
4/14/2010
4/14/2010
4/14/2010 1:27:51 PM
P
PART
Explained the proper method of concrete tool clean up and where the appoved area is located either within the provided washoutpit or an external containment that is located at the back of walk.
ESC09-00352
General Inspection
4/13/2010
4/14/2010
4/14/2010 10:02:01 AM
A
PART
Pedestrian Bridge:
Due to the concern that occured with the dewatering basin last night, the RP is responsible for altering there practices of dewatering to stay compliant. Told the RP that only non turbid water should be discharge into a well vegitative area and or back into Wallings Creek. Also capture all turbid water if it exceeds the DEQ allowable limits to allow sediment to drop within the provided dewatering basin. Once water is within the allowable limit of back ground, than a dischage would be accepted. Will re-inspect on 4/15/10 PM.
ESC10-00226
Site Preparation
4/14/2010
4/14/2010
4/14/2010 9:07:02 AM
PASS