Inspections for the day of: Thursday, April 14, 2011.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00200 Site Preparation4/14/20114/14/20114/14/2011 7:43:46 PM PASS
Due to the confined space, we will allow them to washout concrete next to the footings.
ESC10-00176 Aging Inspection4/14/20114/14/20114/14/2011 4:07:32 PM DONE
PErmit finalled.
ESC10-00176 DOC - Permit Finaled4/14/20114/14/20114/14/2011 4:07:20 PMPPASS
ESC10-00904 BMP Violation4/12/20114/14/20114/14/2011 3:38:21 PMPPART
Discussed with the RP over the issue of providing a washout for all the sub contractors on the project lot so clean out can occur in a contained pit or exteral pit. He explained that the Stucco contractor will provide a wasout on all lots that stuco work will be occuring prior to any cleanout occuring. All other sub contractors either cleanout at the commen subdivion washout or back at the facility. Also explained to the RP if the violation occurs again on any of their project lots, it will requirement to provide a washout on all of the project lots.
ESC10-00675 BMP Violation4/14/20114/14/20114/14/2011 3:21:25 PMPFAIL
Message to RP:
Clean up all sediment tracked from the landscaping activities. Also maintain all storm drain inlet protection through out the project area where inlet protection maintenance needs to occur. Will reinspect on 4/18/2011AM.
ESC11-00041 BMP Violation4/12/20114/14/20114/14/2011 2:10:17 PMPPASS
ESC08-00083 DOC - Permit Finaled4/14/20114/14/20114/14/2011 1:18:57 PMPPASS