Inspections for the day of: Tuesday, April 14, 2015.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-01766 DOC - Permit Expired4/14/20154/14/20154/14/2015 3:02:45 PMPPASS
see bld doc expire
ELE10-01180 ELE-Aging Inspection4/14/20154/14/20154/14/2015 2:59:55 PM DONE
still under construction
ELE15-01003 Electrical Rough-In4/14/20154/14/20154/14/2015 2:44:10 PMPPASS
larry Phone #: ###-#### ri ok
ELE14-01815 Electrical Rough-In4/14/20154/14/20154/14/2015 2:42:03 PMPPASS
Rough in inspection T grid ceiling D Commons south (dining) rooms 133, 134, 136, 140, 142, and 146. Building permit number BLD13-00183. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover as requested
ELE15-00628 Final4/14/20154/14/20154/14/2015 2:12:05 PMPPASS
Please call Kyle Little at ###-#### 30 Min. prior to arrival. Thanks. Phone #: ###-#### Inspection requested via web by MIKE HAGERTY ok final, signed card
ELE15-00879 Electrical Rough-In4/14/20154/14/20154/14/2015 1:24:27 PMPPASS
If you have any questions, please call Jake. Thank You. Phone #: ###-#### Inspection requested via web by Clay Morgan ok cover floor heat
ELE15-01012 Electrical Rough-In4/14/20154/14/20154/14/2015 12:39:20 PMPPASS
slab raceway Inspection requested via web by Kevin Burke ok pour u/g in house only
ELE15-01005 Final4/13/20154/14/20154/14/2015 11:14:11 AMAPASS
Install and wire new dedicated 15 amp 120 volt circuit from panel "A" circuit breaker #20 to new twist lock receptacle to the right of panel "B", please call Dan at ###-#### once you have panel "A" opened Phone #: ###-#### Inspection requested via web by Dan Mitchell ok final
ELE15-01005 Electrical Rough-In4/13/20154/14/20154/14/2015 11:02:56 AMAPASS
Install and wire new dedicated 15 amp 120 volt circuit from panel "A" circuit breaker #20 to new twist lock receptacle to the right of panel "B", please call Dan at ###-#### once you have panel "A" opened Phone #: ###-#### Inspection requested via web by Dan Mitchell ri ok
ELE15-01006 Final4/13/20154/14/20154/14/2015 10:43:33 AMAPASS
Installed and wired new dedicated 15 amp 120 volt circuit from panel "A" circuit breaker #6 to a new twist lock receptacle located just above the left side of panel "B" Phone #: ###-#### Inspection requested via web by Dan Mitchell ok final
ELE15-01006 Electrical Rough-In4/13/20154/14/20154/14/2015 9:51:26 AMAPASS
Installed and wired new dedicated 15 amp 120 volt circuit from panel "A" circuit breaker #6 to a new twist lock receptacle located just above the left side of panel "B" Phone #: ###-#### Inspection requested via web by Dan Mitchell ri ok
ELE15-00383 Final4/13/20154/14/20154/14/2015 9:08:39 AMANH
Phone #: ###-#### Inspection requested via web by Spencer McLean called, left message, nobody answers door, told to call back in
ELE15-00921 Electrical Rough-In4/13/20154/14/20154/14/2015 8:18:29 AMAPASS
Jared Phone #: ###-#### ok cover soffits