ESC15-00151
| Site Final | 4/14/2015 | 4/14/2015 | 4/14/2015 4:25:32 PM | P | PEND |
|
|
Construction complete. Called Sterling to request they remove the DI bag installed now that the site is stabilized and cleaned. RP agreed and stated bags would be removed this week when crews return to site to turn on sprinkler system at house. No other corrections.
|
ESC14-00614
| Tracking Control | 4/10/2015 | 4/14/2015 | 4/14/2015 4:03:59 PM | P | PART |
|
|
Some trackout has been swept up, but lots of loading and unloading of materials and dirt on both large foothill mansion projects. Receiving inlets have sediment filter protection and no hillside erosion occuing. Will request that road is swept up this weekend when subcontractor vehicles aren't filling the street.
|
ESC15-00306
| General Inspection | 4/13/2015 | 4/14/2015 | 4/14/2015 3:38:50 PM | P | CANC |
|
|
|
ESC14-00848
| General Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 3:37:58 PM | | PASS |
|
|
Pool construction near completion. Need to remove remaining landscaping materials not used from the adjacent lot and remove or stake in straw wattle. No offsite discharges or trackout. Will check back.
|
ESC14-00360
| General Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 3:24:07 PM | | PEND |
|
|
No issues at time of inspection but need to get homeowner to move unstabilized stockpile away from slope. Working on contact....
|
ESC14-00106
| General Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 2:33:49 PM | | PASS |
|
|
ESC conditions met. Home complete, landscaped and vegetated. Disturbed area on adajacent lot has vegetation established and is stabilized. Temp wattle removed (this afternoon per Jeremy)
|
ESC14-00106
| DOC - Permit Finaled | 4/14/2015 | 4/14/2015 | 4/14/2015 2:32:17 PM | P | PASS |
|
|
|
ESC14-00144
| General Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 2:14:10 PM | | PASS |
|
|
Subdivision BMPs installed. WIP on SFHs. No significant loose dirt in streets and gutters, no discharges, no fugitive issues at time of inspection.
|
ESC15-00372
| Site Preparation | 4/14/2015 | 4/14/2015 | 4/14/2015 2:05:15 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted. Lined concrete washout has remaining capacity. East Valley DI's have filter bag protection. Current projects in compliance.
|
ESC15-00289
| Site Preparation | 4/14/2015 | 4/14/2015 | 4/14/2015 2:04:59 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted. Lined concrete washout has remaining capacity. East Valley DI's have filter bag protection. Current projects in compliance.
|
ESC15-00243
| Conference | 4/14/2015 | 4/14/2015 | 4/14/2015 1:49:07 PM | P | PASS |
|
|
1:30 conference with Hunter Homes RP to discuss ESC plan for DH#12 and Harris Crossing projects
Conference conducted,
Expectations discussed: 1. Regular sweeping of Hunter Homes projects. 1 x week on weekends 2. Trash containment must be provided to prevent wind blown litter 3. Lined concrete washouts 4. Check that mud is not on roadways during rain events; check for dirt accumulation at inlet filters downstream from HH projects and remove periodically 5. Provide employee training to prevent trackout 6. ESC division to always notify Austin via text for all corrections issued on inspection record.
Hunter Homes site in DH#12 are currently in compliance. Approved to start new projects.
|
ESC15-00350
| Site Preparation | 4/14/2015 | 4/14/2015 | 4/14/2015 12:15:20 PM | P | PASS |
|
|
ACHD downtown roadway re-surfacing project(s) staging area. Stockpile of gravel/road mix currently on site. Permit posted. No additional BMPs required currently.
|
ESC13-00520
| General Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 11:57:12 AM | | PEND |
|
|
No changes or activity at site. No corrections at this time. Both homes still need to pass hillside grading and roof top stormwater drainage and remaining disturbed areas need hydroseeding/final stabilization
|
ESC14-00143
| Aging Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 10:59:52 AM | | PASS |
|
|
Groundwork complete. Site stabilized. No sediment in gutter on culdesac. BLD open, but no activity since Sept. 2014. Permit closed, no further ESC inspections necessary.
|
ESC14-00143
| DOC - Permit Finaled | 4/14/2015 | 4/14/2015 | 4/14/2015 10:57:57 AM | P | PASS |
|
|
|
ESC13-01237
| Aging Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 10:53:23 AM | | PASS |
|
|
Construction complete. Addition surrounded by landscaped/grass yard. No loose sediment onsite. ESC permit conditions met.
|
ESC13-01237
| DOC - Permit Finaled | 4/14/2015 | 4/14/2015 | 4/14/2015 10:52:35 AM | P | PASS |
|
|
|
ESC13-01200
| General Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 10:29:50 AM | | PASS |
|
|
No trackout or discharges offsite to Mitchell.
Installing carports for the 4-plexes so there are numerous stockpiles for the footings currently. Worker on site collecting stockpiles. Trash is contained. Materials being temporarily stockpiled south of new apartment building. Will need to clean/vegetate disturbed area to final ESC permit. No inlet protection provided on private stormdrain (connected to sand/oil interceptor) so will need to be pumped for routine O&M.
|
ESC13-01199
| General Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 10:29:30 AM | | PASS |
|
|
No trackout or discharges offsite to Mitchell.
Installing carports for the 4-plexes so there are numerous stockpiles for the footings currently. Worker on site collecting stockpiles. Trash is contained. Materials being temporarily stockpiled south of new apartment building. Will need to clean/vegetate disturbed area to final ESC permit. No inlet protection provided on private stormdrain (connected to sand/oil interceptor) so will need to be pumped for routine O&M.
|
ESC15-00243
| Conference | 4/13/2015 | 4/14/2015 | 4/14/2015 9:46:52 AM | A | DONE |
|
|
Evan, Andy I would like to meet with both of you tomorrow or Wednesday if possie to get ahold of your opinions and expectations of myself, RP Austin Wagner, in harris ranch and harris crossing so that I can make all of our lives easier in the future. Let me know what works for both of you please ###-#### Phone #: ###-#### Inspection requested via web by Austin Wagner
Called Austin and scheduled meeting for 1:30 later today on site
|
ESC15-00267
| Site Preparation | 4/9/2015 | 4/14/2015 | 4/14/2015 8:52:44 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00283
| Site Preparation | 4/8/2015 | 4/14/2015 | 4/14/2015 8:52:15 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00271
| Site Preparation | 4/9/2015 | 4/14/2015 | 4/14/2015 8:51:49 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00268
| Site Preparation | 4/9/2015 | 4/14/2015 | 4/14/2015 8:50:36 AM | A | PASS |
|
|
Nate Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00284
| Site Preparation | 4/8/2015 | 4/14/2015 | 4/14/2015 8:50:13 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00279
| Site Preparation | 4/8/2015 | 4/14/2015 | 4/14/2015 8:49:56 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00280
| Site Preparation | 4/9/2015 | 4/14/2015 | 4/14/2015 8:49:39 AM | A | PASS |
|
|
Nate Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00272
| Site Preparation | 4/8/2015 | 4/14/2015 | 4/14/2015 8:49:22 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00274
| Site Preparation | 4/8/2015 | 4/14/2015 | 4/14/2015 8:47:45 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00275
| Site Preparation | 4/8/2015 | 4/14/2015 | 4/14/2015 8:47:20 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00270
| Site Preparation | 4/8/2015 | 4/14/2015 | 4/14/2015 8:47:03 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00278
| Site Preparation | 4/8/2015 | 4/14/2015 | 4/14/2015 8:46:45 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00266
| Site Preparation | 4/9/2015 | 4/14/2015 | 4/14/2015 8:46:13 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 other townhomes will have the foundations poured.
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, stockpile control/placement, and having workers park on paved surfaces.
Approved to start to relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00276
| Site Preparation | 4/8/2015 | 4/14/2015 | 4/14/2015 8:44:07 AM | A | PASS |
|
|
Gary Phone #: ###-####
Bella Vista townhome project on Malad Street. 14 townhomes, 7 on each side of the newly developed square/block.
ESC permit issued for each BLD permit per townhome.
BMPs include permit signage, DI protection on subdivision storm drain and new inlet on Malad (west) of construction. Concrete washout pit has been excavated. RP Gary will line with visqueen on Wednesday. Concrete work will be Thursday or Friday.
The project will be phased - 7 homes on the east side will have their foundations started. Once in progress, the 7 townhomes
Discussed other BMPs that will be necessary including trash enclosures, trackout sweep up, and having workers park on paved surfaces.
Approved to start relocate misplaced sewer stub line. Subdivision ESC permit is ESC14-00892
|
ESC15-00268
| Site Preparation | 4/10/2015 | 4/14/2015 | 4/13/2015 2:26:09 PM | A | CANC |
|
|
Malad townhomes..
duplicate inspection entry
|