Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-01159 FIRE-Final Inspection4/13/20164/14/20164/14/2016 1:54:56 PMAFAIL
Provide re-certification of both hood suppresson systems, repair emergency lights and remove deadbolts from the two doors
FIR16-00108 INSP-Sprinkler Rough-in4/14/20164/14/20164/14/2016 12:40:07 PMPPASS
Rough-in passed. Piping can be covered.
FIR16-00183 INSP-Sprinkler Rough-in4/14/20164/14/20164/14/2016 12:13:03 PMPPASS
Underground supply piping is ok to cover. Per conversation with sam the 4" underground from the city connectio to the PIV has been recalculated and will supply the needed water to the building and will be reflected on the future overhead submittals.
FIR15-00709 INSP-Sprinkler Rough-in4/13/20164/14/20164/14/2016 12:07:50 PMAPASS
Rough to cover 3rd and 4th floor passed. Piping can be covered.
BLD15-03823 FIRE-Final Inspection4/13/20164/14/20164/14/2016 12:03:30 PMAPASS
Life safety passed
FIR15-00886 INSP-Final Inspection4/13/20164/14/20164/14/2016 12:03:10 PMAPASS
Permit finaled
FIR16-00125 INSP-Final Inspection4/13/20164/14/20164/14/2016 11:29:14 AMAPASS
Permit finaled
FIR15-00484 INSP-Final Inspection4/13/20164/14/20164/14/2016 11:28:12 AMAPASS
Permit finaled
FIR15-00426 INSP-Final Inspection4/13/20164/14/20164/14/2016 11:27:26 AMACANC
Please meet in the B.25 plan review room. Phone #: ###-#### Inspection requested via web by John Wheeler
FIR16-00094 INSP-Final Inspection4/14/20164/14/20164/14/2016 11:06:50 AMAPASS
Permit finaled