NAF15-00043
| INSP-Sprinkler Rough-in | 4/14/2016 | 4/14/2016 | 4/14/2016 4:42:34 PM | P | PEND |
|
|
Rough-in inspection completed. Verified all uprights and pendant drops. One hangar missing see plans on site. Hangar will be visible at final from drop ceiling. OK to cover PENDING resubmitted calcs for remote area 2 due to two sprinkler heads added to the calc area.
|