BLD16-03359
| FIRE-Final Inspection | 4/14/2017 | 4/14/2017 | 4/14/2017 2:51:55 PM | P | CANC |
|
|
bldg 7, 8; Terry Phone #: ###-####
|
BLD16-02207
| FIRE-Final Inspection | 4/13/2017 | 4/14/2017 | 4/14/2017 12:36:13 PM | P | PASS |
|
|
life safety passed
|
FIR16-00284
| INSP-Sprinkler Rough-in | 4/13/2017 | 4/14/2017 | 4/14/2017 11:38:30 AM | A | PASS |
|
|
Unit 107 piping is ok for cover.
|
FIR17-00080
| INSP-Sprinkler Rough-in | 4/13/2017 | 4/14/2017 | 4/14/2017 11:38:10 AM | A | PASS |
|
|
See the city approved plans for location where piping can be covered as marked with todays date. Still need to view piping when the south canopy is built and need to view insulation in the combustible space as discussed.
|
FIR17-00103
| INSP-Final Inspection | 4/12/2017 | 4/14/2017 | 4/14/2017 11:36:25 AM | A | FAIL |
|
|
Everything tested ok. Permit is ok to final when the as-builts have been received by plan review.
|
NAF15-00041
| INSP-Supply line flush | 4/13/2017 | 4/14/2017 | 4/13/2017 9:56:17 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|