Inspections for the day of: Friday, April 14, 2017.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-03359 FIRE-Final Inspection4/14/20174/14/20174/14/2017 2:51:55 PMPCANC
bldg 7, 8; Terry Phone #: ###-####
BLD16-02207 FIRE-Final Inspection4/13/20174/14/20174/14/2017 12:36:13 PMPPASS
life safety passed
FIR16-00284 INSP-Sprinkler Rough-in4/13/20174/14/20174/14/2017 11:38:30 AMAPASS
Unit 107 piping is ok for cover.
FIR17-00080 INSP-Sprinkler Rough-in4/13/20174/14/20174/14/2017 11:38:10 AMAPASS
See the city approved plans for location where piping can be covered as marked with todays date. Still need to view piping when the south canopy is built and need to view insulation in the combustible space as discussed.
FIR17-00103 INSP-Final Inspection4/12/20174/14/20174/14/2017 11:36:25 AMAFAIL
Everything tested ok. Permit is ok to final when the as-builts have been received by plan review.
NAF15-00041 INSP-Supply line flush4/13/20174/14/20174/13/2017 9:56:17 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball