ESC16-01561
| General Inspection | 4/11/2017 | 4/14/2017 | 4/18/2017 11:04:41 AM | A | PASS |
|
|
Water still ponded in auxiliary parking area. Water is clean and discharging into Walling Creek. Once dewatering is complete for this phase a cleanup of the wetland and creek area will be necessary.
|
ESC15-00745
| General Inspection | 4/14/2017 | 4/14/2017 | 4/17/2017 4:52:23 PM | | PASS |
|
|
Project is complete. Soil is stable. Okay to final.
|
ESC16-00556
| General Inspection | 4/14/2017 | 4/14/2017 | 4/17/2017 3:49:21 PM | | PASS |
|
|
Roads, gutters, sidewalks, stormwater infrastructure installed. No WIP during time of inspection. Silt fence needs repairs, DI bags are installed. Soil is not stable. Stockpiles on site. SWPPP inspections are up to date. Project ok.
|
ESC16-01138
| Aging Inspection | 4/14/2017 | 4/14/2017 | 4/17/2017 3:42:33 PM | | PASS |
|
|
Garage is complete. No lose soil. Ok to final.
|
ESC16-00849
| General Inspection | 4/14/2017 | 4/14/2017 | 4/17/2017 10:04:03 AM | | PASS |
|
|
WIP on interior and exterior. DI bag ok. No trackout. Trash contained. Sign is posted.
|
ESC15-00731
| General Inspection | 4/14/2017 | 4/14/2017 | 4/17/2017 10:03:29 AM | | PASS |
|
|
WIP on interior and exterior. DI bag ok. No trackout. Trash contained. Sign is posted.
|
ESC16-00936
| General Inspection | 4/14/2017 | 4/14/2017 | 4/17/2017 9:39:25 AM | | PASS |
|
|
WIP on retaining wall/foundation. Silt fence needs minor maintenance. No sediment running of site into the vegetated area.
|
ESC13-01279
| General Inspection | 4/14/2017 | 4/14/2017 | 4/14/2017 4:41:48 PM | P | PASS |
|
|
No trackout. Gravel has been added to entrance/exit. No WIP at time of inspection.
|
ESC17-00208
| Site Preparation | 4/14/2017 | 4/14/2017 | 4/14/2017 4:37:43 PM | P | PASS |
|
|
Spoke with RP. He is working with the office to implement more measures to control trackout. Scheduled a sweeper for next Tuesday as well. Sign is posted at the site. Concrete washout has been maintenance. Okay to start.
Clint Phone #: ###-####
|
ESC17-00104
| Site Preparation | 4/14/2017 | 4/14/2017 | 4/14/2017 4:11:01 PM | P | PASS |
|
|
Sign is posted. Silt fence installed. Perimeter wattle installed. Okay to start Rollo Phone #: ###-####
|
ESC16-01047
| Aging Inspection | 4/14/2017 | 4/14/2017 | 4/14/2017 4:10:20 PM | | PASS |
|
|
Not ready for ESC final. Soil not stable. Some trash at site.
|
ESC14-00588
| Site Final | 4/11/2017 | 4/14/2017 | 4/14/2017 1:43:03 PM | A | PASS |
|
|
Preformed site walk through with Corey. All earth disturbing activities are complete. Soil is stable. DI bags and temporary BMPs have been removed. The drainage channel to Logger’s creek is complete and stabilized. Drainage pavers appear to be working. Staging area has been cleaned and no equipment has been left behind. No windblown trash around the site. Gave Colby information on filing the NOT for the CGP permit. Ok to final.
|
ESC16-00509
| Site Final | 4/11/2017 | 4/14/2017 | 4/14/2017 1:42:49 PM | A | PASS |
|
|
Preformed site walk through with Corey. All earth disturbing activities are complete. Soil is stable. DI bags and temporary BMPs have been removed. The drainage channel to Logger’s creek is complete and stabilized. Drainage pavers appear to be working. Staging area has been cleaned and no equipment has been left behind. No windblown trash around the site. Gave Colby information on filing the NOT for the CGP permit. Ok to final.
|
ESC16-00742
| Site Final | 4/11/2017 | 4/14/2017 | 4/14/2017 1:42:36 PM | A | PASS |
|
|
Preformed site walk through with Corey. All earth disturbing activities are complete. Soil is stable. DI bags and temporary BMPs have been removed. The drainage channel to Logger’s creek is complete and stabilized. Drainage pavers appear to be working. Staging area has been cleaned and no equipment has been left behind. No windblown trash around the site. Gave Colby information on filing the NOT for the CGP permit. Ok to final.
|
ESC16-00868
| Site Final | 4/11/2017 | 4/14/2017 | 4/14/2017 10:48:22 AM | P | PASS |
|
|
DI bag has been removed. okay to final.
|
ESC16-00935
| Site Preparation | 4/11/2017 | 4/14/2017 | 4/13/2017 9:46:01 AM | A | CANC |
|
|
|
ESC16-01561
| Site Preparation | 4/11/2017 | 4/14/2017 | 4/13/2017 9:18:35 AM | A | CANC |
|
|
|